- Home/
- Comparison/
- Hydraulic Shovel/
- Hitachi ZX120 vs. Link-Belt 3400 Quantum Long Front Part
Hitachi ZX120 vs. Link-Belt 3400 Quantum Long Front Part
4 reasons to buy Hitachi ZX120:
Swing device
Rotation speed | 13.7 rev / min and 9.7 rev / min | 29 % more or 4.0 rev |
Operation
Generator current strength | 50 amperes and 40 amperes | 20 % more or 10 amperes |
Hydraulic pump flow rate | 210 l/min and 416.4 l/min | 50 % less or 206.4 l/min |
Carrier
Specific ground pressure | 28.4 kPa and 40.2 kPa | 29 % less or 11.8 kPa |
20 reasons to buy Link-Belt 3400 Quantum Long Front Part:
Sizes
Counterweight ground clearance | 1100 mm and 890 mm | 19 % more or 210 mm |
Width to outside of caterpillar track | 3390 mm and 2690 mm | 21 % more or 700 mm |
Clearance | 460 mm and 440 mm | 4 % more or 20 mm |
Operation
Fuel Capacity | 310 l. and 250 l. | 19 % more or 60 l. |
Cooling system fluid volume | 26.7 l. and 19 l. | 29 % more or 7.7 l. |
Hydraulic system fluid volume | 220 l. and 130 l. | 41 % more or 90 l. |
Engine oil volume | 19.5 l. and 15.8 l. | 19 % more or 3.7 l. |
Boom reach drive mechanism fluid volume | 6 l. and 3.2 l. | 47 % more or 2.8 l. |
Motor
Cylinders number | 6 and 4 | 33 % more or 2 |
Effective power | 114.1 kW and 65 kW | 43 % more or 49.1 kW |
Displacement | 6.5 l. and 4.3 l. | 34 % more or 2.2 l. |
Torque measured at | 1700 rev / min and 1600 rev / min | 6 % more or 100 rev |
Maximum torque | 526.1 Nm and 343 Nm | 35 % more or 183.1 Nm |
Carrier
Rolling bearings number on either side | 9 and 7 | 22 % more or 2 |
Track shoes number per side | 51 and 44 | 14 % more or 7 |
Support rollers number on either side | 2 and 1 | 50 % more or 1 |
Booms/sections features 1
Maximum excavation depth | 14500 mm and 5150 mm | 64 % more or 9350 mm |
Maximum radius along ground level | 18270 mm and 7770 mm | 57 % more or 10500 mm |
Maximum loading height | 11600 mm and 5960 mm | 49 % more or 5640 mm |
Maximum vertical wall digging depth | 12150 mm and 4650 mm | 62 % more or 7500 mm |
Neutral reasons:
Sizes
Rear platform swing radius | 2130 mm and 2990 mm |
Caterpillar track length on ground level | 2880 mm and 3840 mm |
Height to cab upper part | 2740 mm and 2990 mm |
Operation
Working weight | 12500 kg and 27805.2 kg |
Operating voltage | 24 V and 24 V |
Hydraulic system overflow valve pressure | 34335.9 kPa and 34335.9 kPa |
Motor
Aspiration | Turbocharging with intercooler and turbocharging |
Manufacturer | Isuzu and Isuzu |
Model | CC-4BG1TC and 6BG1T |
Power measured at | 2150 rev / min and 2150 rev / min |
Carrier
Track width | 1990 mm and 2590 mm |
Maximum travel speed | 5.5 km/h and 5.5 km/h |
Shoe dimensions | 700 mm and 800 mm |
Booms/sections features 1
Unit load-transfer height | 2740 mm and 3110 mm |
Unit load-transfer length | 7610 mm and 14500 mm |
Maximum cut height | 8370 mm and 13760 mm |
Images
Sizes
2. Width to outside of caterpillar track | 2690 mm | 2. Width to outside of caterpillar track | 3390 mm |
4. Caterpillar track length on ground level | 2880 mm | 4. Caterpillar track length on ground level | 3840 mm |
5. Clearance | 440 mm | 5. Clearance | 460 mm |
7. Height to cab upper part | 2740 mm | 7. Height to cab upper part | 2990 mm |
8. Rear platform swing radius | 2130 mm | 8. Rear platform swing radius | 2990 mm |
15. Counterweight ground clearance | 890 mm | 15. Counterweight ground clearance | 1100 mm |
Carrier
6. Track width | 1990 mm | 6. Track width | 2590 mm |
14. Shoe dimensions | 700 mm | 14. Shoe dimensions | 800 mm |
Booms/sections features 1
1. Unit load-transfer length | 7610 mm | 1. Unit load-transfer length | 14500 mm |
3. Unit load-transfer height | 2740 mm | 3. Unit load-transfer height | 3110 mm |
9. Maximum cut height | 8570 mm | 9. Maximum cut height | 13760 mm |
10. Maximum loading height | 6160 mm | 10. Maximum loading height | 11600 mm |
11. Maximum radius along ground level | 8140 mm | 11. Maximum radius along ground level | 18270 mm |
12. Maximum vertical wall digging depth | 5020 mm | 12. Maximum vertical wall digging depth | 12150 mm |
13. Maximum excavation depth | 5570 mm | 13. Maximum excavation depth | 14500 mm |