- Home/
- Comparison/
- Hydraulic Shovel/
- JCB JS130LC TAB vs. Sumitomo SH130-5
JCB JS130LC TAB vs. Sumitomo SH130-5
4 reasons to buy JCB JS130LC TAB:
Sizes
| Clearance | 460 mm and 440 mm | 4 % more or 20 mm |
Operation
| Hydraulic pump flow rate | 248 l/min and 358 l/min | 31 % less or 110 l/min |
Motor
| Power measured at | 2200 rev / min and 2000 rev / min | 9 % more or 200 rev |
| Displacement | 4.3 l. and 3 l. | 30 % more or 1.3 l. |
6 reasons to buy Sumitomo SH130-5:
Sizes
| Width to outside of caterpillar track | 2590 mm and 2490 mm | 4 % more or 100 mm |
Operation
| Hydraulic system overflow valve pressure | 38200 kPa and 34301.4 kPa | 10 % more or 3898.6 kPa |
Carrier
| Maximum travel speed | 5.6 km/h and 5.4 km/h | 4 % more or 0.2 km/h |
Booms/sections features 1
| Maximum excavation depth | 5540 mm and 5350 mm | 3 % more or 190 mm |
| Maximum radius along ground level | 8270 mm and 8140 mm | 2 % more or 130 mm |
| Maximum vertical wall digging depth | 4950 mm and 4910 mm | 1 % more or 40 mm |
Neutral reasons:
Sizes
| Rear platform swing radius | 2050 mm and 2130 mm |
| Caterpillar track length on ground level | 2780 mm and 2780 mm |
Operation
| Working weight | 15700 kg and 12500 kg |
Motor
| Cylinders number | 4 and 4 |
| Manufacturer | EP and Isuzu |
| Model | Isuzu A4BGIT 2 level and AJ-4JJ1X |
Carrier
| Shoe dimensions | 500 mm and 500 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 2490 mm | 2. Width to outside of caterpillar track | 2590 mm |
| 4. Caterpillar track length on ground level | 2780 mm | 4. Caterpillar track length on ground level | 2780 mm |
| 5. Clearance | 460 mm | 5. Clearance | 440 mm |
| 8. Rear platform swing radius | 2050 mm | 8. Rear platform swing radius | 2130 mm |
Carrier
| 14. Shoe dimensions | 500 mm | 14. Shoe dimensions | 500 mm |
Booms/sections features 1
| 11. Maximum radius along ground level | 8525 mm | 11. Maximum radius along ground level | 8270 mm |
| 12. Maximum vertical wall digging depth | 5310 mm | 12. Maximum vertical wall digging depth | 4950 mm |
| 13. Maximum excavation depth | 5755 mm | 13. Maximum excavation depth | 5540 mm |