- Home/
- Comparison/
- Hydraulic Shovel/
- Sumitomo SH700LHD-5 vs. Kato HD1430IIILC
Sumitomo SH700LHD-5 vs. Kato HD1430IIILC
8 reasons to buy Sumitomo SH700LHD-5:
Sizes
| Clearance | 825 mm and 500 mm | 39 % more or 325 mm |
Shovel
| Bucket initial volume | 2.9 m3 and 1.4 m3 | 52 % more or 1.5 m3 |
Operation
| Hydraulic system overflow valve pressure | 34300 kPa and 32900 kPa | 4 % more or 1400 kPa |
Motor
| Full power | 345 kW and 183 kW | 47 % more or 162 kW |
| Displacement | 15.7 l. and 7.5 l. | 52 % more or 8.2 l. |
Booms/sections features 1
| Maximum excavation depth | 8400 mm and 6720 mm | 20 % more or 1680 mm |
| Maximum loading height | 8020 mm and 7110 mm | 11 % more or 910 mm |
| Maximum vertical wall digging depth | 6870 mm and 5740 mm | 16 % more or 1130 mm |
4 reasons to buy Kato HD1430IIILC:
Sizes
| Width to outside of caterpillar track | 3200 mm and 3100 mm | 3 % more or 100 mm |
Operation
| Hydraulic pump flow rate | 602 l/min and 880 l/min | 32 % less or 278 l/min |
Motor
| Power measured at | 2150 rev / min and 1800 rev / min | 16 % more or 350 rev |
Carrier
| Maximum travel speed | 5.5 km/h and 4.1 km/h | 25 % more or 1.4 km/h |
Neutral reasons:
Sizes
| Rear platform swing radius | 3970 mm and 3460 mm |
Operation
| Working weight | 68100 kg and 31100 kg |
Motor
| Cylinders number | 6 and 6 |
| Manufacturer | Isuzu and Mitsubishi |
| Model | AH6WGIXYSS-01 and C 6D16-TLE2A |
Carrier
| Shoe dimensions | 650 mm and 600 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 3100 mm | 2. Width to outside of caterpillar track | 3200 mm |
| 5. Clearance | 825 mm | 5. Clearance | 500 mm |
| 8. Rear platform swing radius | 3970 mm | 8. Rear platform swing radius | 3460 mm |
Carrier
| 14. Shoe dimensions | 650 mm | 14. Shoe dimensions | 600 mm |
Booms/sections features 1
| 10. Maximum loading height | 8020 mm | 10. Maximum loading height | 7570 mm |
| 12. Maximum vertical wall digging depth | 6870 mm | 12. Maximum vertical wall digging depth | 7480 mm |
| 13. Maximum excavation depth | 8400 mm | 13. Maximum excavation depth | 8400 mm |