vs.

      Sumitomo SH800LHD-5 vs. Doosan S225LCSLR

      4 reasons to buy Sumitomo SH800LHD-5:

      Sizes

      Clearance 890 mm and 480 mm 46 % more or 410 mm
      Width to outside of caterpillar track 4360 mm and 2990 mm 31 % more or 1370 mm

      Operation

      Hydraulic system overflow valve pressure 34300 kPa and 32336.4 kPa 6 % more or 1963.6 kPa

      Motor

      Displacement 15.7 l. and 5.8 l. 63 % more or 9.9 l.

      6 reasons to buy Doosan S225LCSLR:

      Operation

      Hydraulic pump flow rate 430 l/min and 1000 l/min 57 % less or 570 l/min

      Motor

      Power measured at 1950 rev / min and 1800 rev / min 8 % more or 150 rev

      Booms/sections features 1

      Maximum excavation depth 11650 mm and 8640 mm 26 % more or 3010 mm
      Maximum radius along ground level 15280 mm and 13840 mm 9 % more or 1440 mm
      Maximum loading height 10910 mm and 8920 mm 18 % more or 1990 mm
      Maximum vertical wall digging depth 10790 mm and 6440 mm 40 % more or 4350 mm

      Neutral reasons:

      Sizes

      Rear platform swing radius 4280 mm and 2750 mm
      Caterpillar track length on ground level 5070 mm and 3645 mm

      Operation

      Working weight 80100 kg and 23586.8 kg

      Motor

      Manufacturer Isuzu and Doosan
      Model AH-6WG1XYSS-02 and DB58TIS

      Carrier

      Shoe dimensions 650 mm and 600 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 4360 mm 2. Width to outside of caterpillar track 2990 mm
      4. Caterpillar track length on ground level 5070 mm 4. Caterpillar track length on ground level 3645 mm
      5. Clearance 890 mm 5. Clearance 480 mm
      8. Rear platform swing radius 4280 mm 8. Rear platform swing radius 2750 mm

      Carrier

      14. Shoe dimensions 650 mm 14. Shoe dimensions 600 mm

      Booms/sections features 1

      10. Maximum loading height 8920 mm 10. Maximum loading height 10910 mm
      11. Maximum radius along ground level 13840 mm 11. Maximum radius along ground level 15280 mm
      12. Maximum vertical wall digging depth 6440 mm 12. Maximum vertical wall digging depth 10790 mm
      13. Maximum excavation depth 8640 mm 13. Maximum excavation depth 11650 mm