- Home/
- Comparison/
- Hydraulic Shovel/
- YTO WY10B vs. Komatsu PC308USLC-3
YTO WY10B vs. Komatsu PC308USLC-3
1 reasons to buy YTO WY10B:
Carrier
Maximum travel speed | 12.4 km/h and 4.6 km/h | 63 % more or 7.8 km/h |
6 reasons to buy Komatsu PC308USLC-3:
Sizes
Clearance | 500 mm and 384 mm | 23 % more or 116 mm |
Counterweight ground clearance | 1185 mm and 920 mm | 22 % more or 265 mm |
Width to outside of caterpillar track | 3440 mm and 2410 mm | 30 % more or 1030 mm |
Motor
Effective power | 140 kW and 60 kW | 57 % more or 80 kW |
Booms/sections features 1
Maximum excavation depth | 6460 mm and 4120 mm | 36 % more or 2340 mm |
Maximum loading height | 7200 mm and 4000 mm | 44 % more or 3200 mm |
Neutral reasons:
Sizes
Height to cab upper part | 2771 mm and 3130 mm |
Rear platform swing radius | 1945 mm and 3450 mm |
Caterpillar track length on ground level | 2600 mm and 4030 mm |
Operation
Working weight | 10800 kg and 32630 kg |
Motor
Aspiration | turbocharging and Turbocharged engine with subsequent cooling of charging air by oncoming air flow |
Model | LR4105ZG56 and SAA6D107E-1 |
Booms/sections features 1
Unit load-transfer length | 6760 mm and 9545 mm |
Maximum cut height | 5620 mm and 10130 mm |
Images
Sizes
8. Rear platform swing radius | 1945 mm | 8. Rear platform swing radius | 3450 mm |
15. Counterweight ground clearance | 920 mm | 15. Counterweight ground clearance | 1185 mm |
2. Width to outside of caterpillar track | 2410 mm | 2. Width to outside of caterpillar track | 3440 mm |
4. Caterpillar track length on ground level | 2600 mm | 4. Caterpillar track length on ground level | 4030 mm |
5. Clearance | 384 mm | 5. Clearance | 500 mm |
7. Height to cab upper part | 2771 mm | 7. Height to cab upper part | 3130 mm |
Booms/sections features 1
1. Unit load-transfer length | 6760 mm | 1. Unit load-transfer length | 9500 mm |
9. Maximum cut height | 5620 mm | 9. Maximum cut height | 10730 mm |
10. Maximum loading height | 4000 mm | 10. Maximum loading height | 7985 mm |
13. Maximum excavation depth | 4120 mm | 13. Maximum excavation depth | 7560 mm |