- Home/
- Comparison/
- Medium-Sized Excavator/
- Caterpillar 307B SB vs. Hitachi ZX85USB-3
Caterpillar 307B SB vs. Hitachi ZX85USB-3
4 reasons to buy Caterpillar 307B SB:
Sizes
Clearance | 380 mm and 360 mm | 5 % more or 20 mm |
Operation
Hydraulic pump flow rate | 128 l/min and 158.4 l/min | 19 % less or 30.4 l/min |
Motor
Displacement | 2.8 l. and 2.2 l. | 21 % more or 0.6 l. |
Booms/sections features 1
Maximum excavation depth | 4160 mm and 3970 mm | 5 % more or 190 mm |
5 reasons to buy Hitachi ZX85USB-3:
Sizes
Width to outside of caterpillar track | 2320 mm and 2200 mm | 5 % more or 120 mm |
Motor
Full power | 40.5 kW and 40.3 kW | 0 % more or 0.2 kW |
Booms/sections features 1
Maximum radius along ground level | 7050 mm and 6890 mm | 2 % more or 160 mm |
Maximum loading height | 6810 mm and 4160 mm | 39 % more or 2650 mm |
Maximum vertical wall digging depth | 3450 mm and 3000 mm | 13 % more or 450 mm |
Neutral reasons:
Sizes
Rear platform swing radius | 1750 mm and 1490 mm |
Caterpillar track length on ground level | 2120 mm and 2290 mm |
Operation
Working weight | 7400 kg and 8080 kg |
Motor
Manufacturer | Mitsubishi and Isuzu |
Model | 4M40E1 and AU-4LE2X |
Carrier
Maximum travel speed | 5 km/h and 5 km/h |
Shoe dimensions | 450 mm and 450 mm |
Images
Sizes
8. Rear platform swing radius | 1750 mm | 8. Rear platform swing radius | 1490 mm |
2. Width to outside of caterpillar track | 2200 mm | 2. Width to outside of caterpillar track | 2320 mm |
4. Caterpillar track length on ground level | 2120 mm | 4. Caterpillar track length on ground level | 2290 mm |
5. Clearance | 380 mm | 5. Clearance | 360 mm |
Carrier
14. Shoe dimensions | 450 mm | 14. Shoe dimensions | 450 mm |
Booms/sections features 1
10. Maximum loading height | 4450 mm | 10. Maximum loading height | 6810 mm |
11. Maximum radius along ground level | 7420 mm | 11. Maximum radius along ground level | 7050 mm |
12. Maximum vertical wall digging depth | 3580 mm | 12. Maximum vertical wall digging depth | 3450 mm |
13. Maximum excavation depth | 4700 mm | 13. Maximum excavation depth | 3970 mm |