vs.

      LiuGong CLG908C vs. Sumitomo SH75X-3B

      5 reasons to buy LiuGong CLG908C:

      Sizes

      Clearance 380 mm and 360 mm 5 % more or 20 mm

      Motor

      Full power 60 kW and 40 kW 33 % more or 20 kW
      Power measured at 2200 rev / min and 2000 rev / min 9 % more or 200 rev
      Displacement 3.3 l. and 2.2 l. 33 % more or 1.1 l.

      Booms/sections features 1

      Maximum excavation depth 4150 mm and 4140 mm 0 % more or 10 mm

      5 reasons to buy Sumitomo SH75X-3B:

      Sizes

      Width to outside of caterpillar track 2320 mm and 2200 mm 5 % more or 120 mm

      Operation

      Hydraulic system overflow valve pressure 29399.2 kPa and 28000 kPa 5 % more or 1399.2 kPa

      Carrier

      Maximum travel speed 5.3 km/h and 4.2 km/h 21 % more or 1.1 km/h

      Booms/sections features 1

      Maximum loading height 5250 mm and 5080 mm 3 % more or 170 mm
      Maximum vertical wall digging depth 3640 mm and 3230 mm 11 % more or 410 mm

      Neutral reasons:

      Sizes

      Rear platform swing radius 1750 mm and 1425 mm
      Caterpillar track length on ground level 2230 mm and 2210 mm

      Operation

      Working weight 7700 kg and 7920 kg

      Motor

      Model B3.3 and AU-4LE2X
      Manufacturer Cummins and Isuzu

      Carrier

      Shoe dimensions 450 mm and 450 mm

      Booms/sections features 1

      Unit load-transfer height 2600 mm and 2900 mm
      Unit load-transfer length 6130 mm and 5915 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 2200 mm 2. Width to outside of caterpillar track 2320 mm
      4. Caterpillar track length on ground level 2230 mm 4. Caterpillar track length on ground level 2210 mm
      5. Clearance 380 mm 5. Clearance 360 mm
      8. Rear platform swing radius 1750 mm 8. Rear platform swing radius 1425 mm

      Carrier

      14. Shoe dimensions 450 mm 14. Shoe dimensions 450 mm

      Booms/sections features 1

      10. Maximum loading height 5080 mm 10. Maximum loading height 5540 mm
      12. Maximum vertical wall digging depth 3230 mm 12. Maximum vertical wall digging depth 4100 mm
      13. Maximum excavation depth 4150 mm 13. Maximum excavation depth 4540 mm
      1. Unit load-transfer length 6130 mm 1. Unit load-transfer length 5915 mm
      3. Unit load-transfer height 2600 mm 3. Unit load-transfer height 2900 mm