- Home/
- Comparison/
- Medium-Sized Excavator/
- Nagano NS55 vs. Terex TC48
Nagano NS55 vs. Terex TC48
5 reasons to buy Nagano NS55:
Operation
Hydraulic pump flow rate | 60 l/min and 159 l/min | 62 % less or 99 l/min |
Motor
Power measured at | 2400 rev / min and 2200 rev / min | 8 % more or 200 rev |
Booms/sections features 1
Maximum excavation depth | 3750 mm and 3700 mm | 1 % more or 50 mm |
Maximum loading height | 3830 mm and 3600 mm | 6 % more or 230 mm |
Maximum vertical wall digging depth | 2910 mm and 1900 mm | 35 % more or 1010 mm |
4 reasons to buy Terex TC48:
Sizes
Width to outside of caterpillar track | 1900 mm and 1850 mm | 3 % more or 50 mm |
Motor
Displacement | 2.5 l. and 2.4 l. | 4 % more or 0.1 l. |
Carrier
Maximum travel speed | 5 km/h and 4.2 km/h | 16 % more or 0.8 km/h |
Booms/sections features 1
Maximum radius along ground level | 6200 mm and 5915 mm | 5 % more or 285 mm |
Neutral reasons:
Sizes
Rear platform swing radius | 1550 mm and 1500 mm |
Operation
Working weight | 5350 kg and 4953.2 kg |
Motor
Manufacturer | Kubota and Mitsubishi |
Cylinders number | 4 and 4 |
Carrier
Shoe dimensions | 400 mm and 400 mm |
Booms/sections features 1
Unit load-transfer height | 2530 mm and 2591 mm |
Unit load-transfer length | 5795 mm and 5537 mm |
Images
Sizes
8. Rear platform swing radius | 1550 mm | 8. Rear platform swing radius | 1500 mm |
2. Width to outside of caterpillar track | 1850 mm | 2. Width to outside of caterpillar track | 1900 mm |
Carrier
14. Shoe dimensions | 400 mm | 14. Shoe dimensions | 400 mm |
Booms/sections features 1
1. Unit load-transfer length | 5795 mm | 1. Unit load-transfer length | 5537 mm |
3. Unit load-transfer height | 2530 mm | 3. Unit load-transfer height | 2591 mm |
10. Maximum loading height | 3830 mm | 10. Maximum loading height | 3700 mm |
11. Maximum radius along ground level | 5915 mm | 11. Maximum radius along ground level | 6200 mm |
12. Maximum vertical wall digging depth | 2910 mm | 12. Maximum vertical wall digging depth | 2100 mm |
13. Maximum excavation depth | 3750 mm | 13. Maximum excavation depth | 3900 mm |