- Home/
- Comparison/
- Mini Digger/
- Hitachi ZX8-2 vs. JCB 8016
Hitachi ZX8-2 vs. JCB 8016
3 reasons to buy Hitachi ZX8-2:
Operation
| Hydraulic pump flow rate | 21.2 l/min and 26.9 l/min | 21 % less or 5.7 l/min |
Carrier
| Specific ground pressure | 26 kPa and 29.4 kPa | 12 % less or 3.4 kPa |
| Maximum travel speed | 4 km/h and 3.8 km/h | 5 % more or 0.2 km/h |
19 reasons to buy JCB 8016:
Swing device
| Rotation speed | 10 rev / min and 8.5 rev / min | 15 % more or 1.5 rev |
Sizes
| Width to outside of caterpillar track | 980 mm and 910 mm | 7 % more or 70 mm |
| Clearance | 158 mm and 130 mm | 18 % more or 28 mm |
Operation
| Hydraulic system overflow valve pressure | 23000.9 kPa and 17700 kPa | 23 % more or 5300.9 kPa |
| Fuel Capacity | 23.5 l. and 16 l. | 32 % more or 7.5 l. |
| Cooling system fluid volume | 5 l. and 3.3 l. | 34 % more or 1.7 l. |
| Hydraulic system fluid volume | 28 l. and 18 l. | 36 % more or 10 l. |
| Engine oil volume | 4 l. and 2.8 l. | 30 % more or 1.2 l. |
Motor
| Effective power | 14.2 kW and 9.5 kW | 33 % more or 4.7 kW |
| Power measured at | 2200 rev / min and 2100 rev / min | 5 % more or 100 rev |
| Torque measured at | 1600 rev / min and 1500 rev / min | 6 % more or 100 rev |
| Maximum torque | 62 Nm and 50.5 Nm | 19 % more or 11.5 Nm |
Carrier
| Rolling bearings number on either side | 3 and 2 | 33 % more or 1 |
Booms/sections features 2
| Maximum excavation depth | 2144 mm and 1800 mm | 16 % more or 344 mm |
| Maximum loading height | 2559 mm and 2150 mm | 16 % more or 409 mm |
| Maximum vertical wall digging depth | 1754 mm and 1600 mm | 9 % more or 154 mm |
Booms/sections features 1
| Maximum excavation depth | 2044 mm and 1600 mm | 22 % more or 444 mm |
| Maximum loading height | 2501 mm and 2050 mm | 18 % more or 451 mm |
| Maximum vertical wall digging depth | 1659 mm and 1450 mm | 13 % more or 209 mm |
Neutral reasons:
Sizes
| Height to cab upper part | 2150 mm and 2318 mm |
| Rear platform swing radius | 1090 mm and 1028 mm |
| Caterpillar track length on ground level | 900 mm and 1127 mm |
Operation
| Working weight | 1100 kg and 1590 kg |
| Operating voltage | 12 V and 12 V |
Motor
| Model | 3TNV70 and 403C-11 |
Carrier
| Shoe dimensions | 180 mm and 230 mm |
| Track width | 730 mm and 742 mm |
Booms/sections features 2
| Unit load-transfer height | 2150 mm and 2304 mm |
| Unit load-transfer length | 3030 mm and 3261 mm |
| Maximum cut height | 2940 mm and 3454 mm |
Booms/sections features 1
| Unit load-transfer height | 2150 mm and 2318 mm |
| Unit load-transfer length | 2970 mm and 3346 mm |
| Maximum cut height | 2840 mm and 3393 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 910 mm | 2. Width to outside of caterpillar track | 980 mm |
| 4. Caterpillar track length on ground level | 900 mm | 4. Caterpillar track length on ground level | 1127 mm |
| 5. Clearance | 130 mm | 5. Clearance | 158 mm |
| 7. Height to cab upper part | 2150 mm | 7. Height to cab upper part | 2318 mm |
| 8. Rear platform swing radius | 1090 mm | 8. Rear platform swing radius | 1028 mm |
Carrier
| 6. Track width | 730 mm | 6. Track width | 742 mm |
| 14. Shoe dimensions | 180 mm | 14. Shoe dimensions | 230 mm |
Booms/sections features 1
| 9. Maximum cut height | 2940 mm | 9. Maximum cut height | 3393 mm |
| 10. Maximum loading height | 2150 mm | 10. Maximum loading height | 2501 mm |
| 12. Maximum vertical wall digging depth | 1600 mm | 12. Maximum vertical wall digging depth | 1659 mm |
| 1. Unit load-transfer length | 3030 mm | 1. Unit load-transfer length | 3261 mm |
| 13. Maximum excavation depth | 1800 mm | 13. Maximum excavation depth | 2044 mm |
| 3. Unit load-transfer height | 2150 mm | 3. Unit load-transfer height | 2304 mm |