- Home/
- Comparison/
- Mini Digger/
- John Deere 27D vs. Gehl 153
John Deere 27D vs. Gehl 153
8 reasons to buy John Deere 27D:
Sizes
Clearance | 320 mm and 200 mm | 37 % more or 120 mm |
Operation
Fuel Capacity | 40 l. and 24 l. | 40 % more or 16 l. |
Hydraulic system fluid volume | 34.8 l. and 21 l. | 40 % more or 13.8 l. |
Hydraulic pump flow rate | 62.1 l/min and 70.8 l/min | 12 % less or 8.7 l/min |
Motor
Effective power | 20 kW and 17.7 kW | 11 % more or 2.3 kW |
Displacement | 1.6 l. and 1 l. | 37 % more or 0.6 l. |
Booms/sections features 1
Maximum excavation depth | 2620 mm and 2185 mm | 17 % more or 435 mm |
Maximum loading height | 3210 mm and 2545 mm | 21 % more or 665 mm |
3 reasons to buy Gehl 153:
Swing device
Rotation speed | 10 rev / min and 9.1 rev / min | 9 % more or 0.9 rev |
Carrier
Specific ground pressure | 26.2 kPa and 26.9 kPa | 3 % less or 0.7 kPa |
Maximum travel speed | 5.6 km/h and 4.5 km/h | 20 % more or 1.1 km/h |
Neutral reasons:
Sizes
Height to cab upper part | 2460 mm and 2380 mm |
Rear platform swing radius | 775 mm and 1160 mm |
Caterpillar track length on ground level | 1490 mm and 1223 mm |
Operation
Working weight | 2900 kg and 1705.1 kg |
Motor
Model | 3TNV88 and 3TNE 74 |
Power measured at | 2200 rev / min and 2200 rev / min |
Manufacturer | Yanmar and Yanmar |
Carrier
Shoe dimensions | 300 mm and 230 mm |
Booms/sections features 1
Maximum cut height | 4460 mm and 3500 mm |
Images
Sizes
4. Caterpillar track length on ground level | 1490 mm | 4. Caterpillar track length on ground level | 1223 mm |
5. Clearance | 320 mm | 5. Clearance | 200 mm |
7. Height to cab upper part | 2460 mm | 7. Height to cab upper part | 2380 mm |
8. Rear platform swing radius | 775 mm | 8. Rear platform swing radius | 1160 mm |
Carrier
14. Shoe dimensions | 300 mm | 14. Shoe dimensions | 230 mm |
Booms/sections features 1
9. Maximum cut height | 4460 mm | 9. Maximum cut height | 4005 mm |
10. Maximum loading height | 3210 mm | 10. Maximum loading height | 2910 mm |
13. Maximum excavation depth | 2620 mm | 13. Maximum excavation depth | 2280 mm |