vs.

      New Holland E20.2SR vs. Nagano NS35R

      1 reasons to buy New Holland E20.2SR:

      Operation

      Hydraulic pump flow rate 52 l/min and 67.2 l/min 23 % less or 15.2 l/min

      8 reasons to buy Nagano NS35R:

      Sizes

      Width to outside of caterpillar track 1700 mm and 1400 mm 18 % more or 300 mm

      Motor

      Power measured at 2400 rev / min and 2200 rev / min 8 % more or 200 rev
      Cylinders number 4 and 3 25 % more or 1

      Carrier

      Maximum travel speed 4.5 km/h and 4.2 km/h 7 % more or 0.3 km/h

      Booms/sections features 1

      Maximum excavation depth 3130 mm and 2300 mm 27 % more or 830 mm
      Maximum radius along ground level 5250 mm and 4060 mm 23 % more or 1190 mm
      Maximum loading height 3230 mm and 2470 mm 24 % more or 760 mm
      Maximum vertical wall digging depth 2185 mm and 1790 mm 18 % more or 395 mm

      Neutral reasons:

      Sizes

      Rear platform swing radius 700 mm and 885 mm
      Caterpillar track length on ground level 1490 mm and 1640 mm

      Operation

      Working weight 2230 kg and 3620 kg

      Motor

      Manufacturer Yanmar and Mitsubishi
      Displacement 1.3 l. and 1.3 l.

      Carrier

      Shoe dimensions 250 mm and 300 mm

      Booms/sections features 1

      Unit load-transfer height 2460 mm and 2470 mm
      Unit load-transfer length 3820 mm and 4685 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 1400 mm 2. Width to outside of caterpillar track 1700 mm
      4. Caterpillar track length on ground level 1490 mm 4. Caterpillar track length on ground level 1640 mm
      8. Rear platform swing radius 700 mm 8. Rear platform swing radius 885 mm

      Carrier

      14. Shoe dimensions 250 mm 14. Shoe dimensions 300 mm

      Booms/sections features 1

      3. Unit load-transfer height 2460 mm 3. Unit load-transfer height 2470 mm
      10. Maximum loading height 2470 mm 10. Maximum loading height 3230 mm
      11. Maximum radius along ground level 4060 mm 11. Maximum radius along ground level 5250 mm
      12. Maximum vertical wall digging depth 1790 mm 12. Maximum vertical wall digging depth 2185 mm
      13. Maximum excavation depth 2300 mm 13. Maximum excavation depth 3130 mm
      1. Unit load-transfer length 3860 mm 1. Unit load-transfer length 4685 mm