- Home/
- Comparison/
- Mini Digger/
- Terex HR2.0 vs. Komatsu PC15R-8
Terex HR2.0 vs. Komatsu PC15R-8
7 reasons to buy Terex HR2.0:
Operation
Fuel Capacity | 30 l. and 20 l. | 33 % more or 10 l. |
Hydraulic system fluid volume | 35 l. and 23 l. | 34 % more or 12 l. |
Motor
Effective power | 13.4 kW and 11.4 kW | 15 % more or 2.0 kW |
Maximum torque | 54 Nm and 49 Nm | 9 % more or 5 Nm |
Booms/sections features 1
Maximum excavation depth | 2300 mm and 2160 mm | 6 % more or 140 mm |
Maximum radius along ground level | 4200 mm and 3640 mm | 13 % more or 560 mm |
Maximum loading height | 2600 mm and 2500 mm | 4 % more or 100 mm |
7 reasons to buy Komatsu PC15R-8:
Swing device
Rotation speed | 10.4 rev / min and 10 rev / min | 4 % more or 0.4 rev |
Operation
Hydraulic system overflow valve pressure | 20600 kPa and 17995.3 kPa | 13 % more or 2604.7 kPa |
Hydraulic pump flow rate | 45.1 l/min and 58.3 l/min | 23 % less or 13.2 l/min |
Motor
Torque measured at | 1800 rev / min and 1500 rev / min | 17 % more or 300 rev |
Power measured at | 2600 rev / min and 2400 rev / min | 8 % more or 200 rev |
Carrier
Maximum travel speed | 4.2 km/h and 4.1 km/h | 2 % more or 0.1 km/h |
Booms/sections features 1
Maximum vertical wall digging depth | 1560 mm and 960 mm | 38 % more or 600 mm |
Neutral reasons:
Sizes
Width to outside of caterpillar track | 1000 mm and 1000 mm |
Rear platform swing radius | 1200 mm and 1070 mm |
Operation
Working weight | 2000 kg and 1650 kg |
Operating voltage | 12 V and 12 V |
Motor
Cylinders number | 3 and 3 |
Manufacturer | Mitsubishi and Komatsu |
Model | L3E-W 262 KL and 3D68E-N3FB |
Carrier
Shoe dimensions | 230 mm and 230 mm |
Booms/sections features 1
Maximum cut height | 3620 mm and 3480 mm |
Images
Sizes
2. Width to outside of caterpillar track | 1000 mm | 2. Width to outside of caterpillar track | 1000 mm |
8. Rear platform swing radius | 1200 mm | 8. Rear platform swing radius | 1070 mm |
Carrier
14. Shoe dimensions | 230 mm | 14. Shoe dimensions | 230 mm |
Booms/sections features 1
13. Maximum excavation depth | 2500 mm | 13. Maximum excavation depth | 2160 mm |
9. Maximum cut height | 3740 mm | 9. Maximum cut height | 3480 mm |
10. Maximum loading height | 2720 mm | 10. Maximum loading height | 2500 mm |
11. Maximum radius along ground level | 4370 mm | 11. Maximum radius along ground level | 3640 mm |
12. Maximum vertical wall digging depth | 1130 mm | 12. Maximum vertical wall digging depth | 1560 mm |