- Home/
- Comparison/
- Wheeled Excavator/
- JCB JS175W vs. New Holland MH5.6
JCB JS175W vs. New Holland MH5.6
13 reasons to buy JCB JS175W:
Swing device
Rotation speed | 11.3 rev / min and 9.5 rev / min | 16 % more or 1.8 rev |
Sizes
Clearance | 350 mm and 330 mm | 6 % more or 20 mm |
Upper structure clearance | 1270 mm and 1250 mm | 2 % more or 20 mm |
Operation
Engine oil volume | 19.5 l. and 16 l. | 18 % more or 3.5 l. |
Hydraulic pump flow rate | 312 l/min and 450 l/min | 31 % less or 138 l/min |
Motor
Displacement | 6.5 l. and 5.9 l. | 9 % more or 0.6 l. |
Gear box
Maximum travel speed | 30 km/h and 20 km/h | 33 % more or 10 km/h |
Boom/section options 3
Maximum vertical wall digging depth | 4839 mm and 4425 mm | 9 % more or 414 mm |
Maximum excavation depth | 6451 mm and 6150 mm | 5 % more or 301 mm |
Boom/section options 2
Maximum excavation depth | 6120 mm and 5755 mm | 6 % more or 365 mm |
Maximum vertical wall digging depth | 4178 mm and 4065 mm | 3 % more or 113 mm |
Boom/section options 1
Maximum excavation depth | 5682 mm and 5355 mm | 6 % more or 327 mm |
Maximum vertical wall digging depth | 3826 mm and 3710 mm | 3 % more or 116 mm |
12 reasons to buy New Holland MH5.6:
Operation
Fuel Capacity | 360 l. and 290 l. | 19 % more or 70 l. |
Cooling system fluid volume | 30 l. and 25.5 l. | 15 % more or 4.5 l. |
Hydraulic system fluid volume | 140 l. and 124 l. | 11 % more or 16 l. |
Generator current strength | 70 amperes and 40 amperes | 43 % more or 30 amperes |
Hydraulic system overflow valve pressure | 34500 kPa and 34301.4 kPa | 1 % more or 198.6 kPa |
Motor
Effective power | 113.3 kW and 102.9 kW | 9 % more or 10.4 kW |
Boom/section options 3
Maximum loading height | 7685 mm and 7174 mm | 7 % more or 511 mm |
Maximum radius along ground level | 9670 mm and 9163 mm | 5 % more or 507 mm |
Boom/section options 2
Maximum radius along ground level | 9275 mm and 8776 mm | 5 % more or 499 mm |
Maximum loading height | 7365 mm and 6805 mm | 8 % more or 560 mm |
Boom/section options 1
Maximum radius along ground level | 8885 mm and 8386 mm | 6 % more or 499 mm |
Maximum loading height | 7050 mm and 6636 mm | 6 % more or 414 mm |
Neutral reasons:
Sizes
Overall width | 2490 mm and 2540 mm |
Height to cab upper part | 3185 mm and 3070 mm |
Operation
Tyre size | dual: 10x20 16PR, single: 18Rx19.5 (Radial) and 10.00-20 |
Working weight | 18120 kg and 20430 kg |
Operating voltage | 24 V and 24 V |
Motor
Cylinders number | 6 and 6 |
Aspiration | turbocharging diesel and Turbocharger with charge air cooler by oncoming air flow |
Boom/section options 3
Unit load-transfer length | 8454 mm and 8765 mm |
Maximum cut height | 9688 mm and 10610 mm |
Option - Boom/Section (MEX) 3 | Monoblock boom with excavator bucket 3050mm and 2pc Boom / Section 2800mm |
Unit load-transfer height | 3240 mm and 3090 mm |
Boom/section options 2
Unit load-transfer height | 2765 mm and 3070 mm |
Unit load-transfer length | 8283 mm and 8780 mm |
Maximum cut height | 9237 mm and 10295 mm |
Option - Boom/Section (MEX) 2 | Monoblock boom with excavator bucket 2700mm and 2pc Boom / Section 2400mm |
Boom/section options 1
Option - Boom/Section (MEX) 1 | Monoblock boom with excavator bucket 2250mm and 2pc Boom / Section 2000mm |
Unit load-transfer height | 2765 mm and 3070 mm |
Unit load-transfer length | 8293 mm and 8805 mm |
Maximum cut height | 9102 mm and 9975 mm |
Images
Sizes
2. Overall width | 2490 mm | 2. Overall width | 2540 mm |
5. Clearance | 350 mm | 5. Clearance | 330 mm |
7. Height to cab upper part | 3185 mm | 7. Height to cab upper part | 3070 mm |
14. Upper structure clearance | 1270 mm | 14. Upper structure clearance | 1250 mm |
Boom/section options 1
9. Maximum cut height | 9688 mm | 9. Maximum cut height | 9975 mm |
10. Maximum loading height | 7174 mm | 10. Maximum loading height | 7050 mm |
11. Maximum radius along ground level | 9163 mm | 11. Maximum radius along ground level | 8885 mm |
12. Maximum vertical wall digging depth | 4839 mm | 12. Maximum vertical wall digging depth | 3710 mm |
13. Maximum excavation depth | 6451 mm | 13. Maximum excavation depth | 5355 mm |
1. Unit load-transfer length | 8293 mm | 1. Unit load-transfer length | 8780 mm |
3. Unit load-transfer height | 2765 mm | 3. Unit load-transfer height | 3070 mm |