- Home/
- Comparison/
- Mining Excavator/
- Komatsu PC2000-8 vs. Terex RH200
Komatsu PC2000-8 vs. Terex RH200
9 reasons to buy Komatsu PC2000-8:
Shovel boom/sections 1
Maximum excavation depth | 9235 mm and 9200 mm | 0 % more or 35 mm |
Shovel
Bucket minimum volume | 12 m3 and 21 m3 | 43 % less or 9 m3 |
Operation
Rotation speed | 4.8 rev / min and 3.9 rev / min | 19 % more or 0.9 rev |
Loading bucket
Maximum excavation depth | 3190 mm and 2400 mm | 25 % more or 790 mm |
Carrier
Upper rollers number | 3 and 2 | 33 % more or 1 |
Lower rollers number | 8 and 6 | 25 % more or 2 |
Bucket loader specific ground pressure | 186 kPa and 257.2 kPa | 28 % less or 71.2 kPa |
Track shoes number on either side | 49 and 39 | 20 % more or 10 |
Excavator specific ground pressure with support 1 | 190 kPa and 262.7 kPa | 28 % less or 72.7 kPa |
17 reasons to buy Terex RH200:
Sizes
Caterpillar track length | 8540 mm and 7445 mm | 13 % more or 1095 mm |
Clearance | 1120 mm and 825 mm | 26 % more or 295 mm |
Upper structure clearance | 2780 mm and 2095 mm | 25 % more or 685 mm |
Shovel
Maximum bucket volume | 30.5 m3 and 13.7 m3 | 55 % more or 16.8 m3 |
Bucket initial volume | 21 m3 and 12 m3 | 43 % more or 9 m3 |
Operation
Fuel Capacity | 10674.9 l. and 3400 l. | 68 % more or 7274.9 l. |
Hydraulic system fluid volume | 6100 l. and 1300 l. | 79 % more or 4800 l. |
Motor
Displacement | 37.7 l. and 30.5 l. | 19 % more or 7.2 l. |
Cylinders number | 24 and 12 | 50 % more or 12 |
Full power | 1879.2 kW and 728 kW | 61 % more or 1151.2 kW |
Effective power | 1879.2 kW and 713 kW | 62 % more or 1166.2 kW |
Loading bucket
Maximum unloading height | 11800 mm and 9665 mm | 18 % more or 2135 mm |
Maximum digging radius | 16200 mm and 13170 mm | 19 % more or 3030 mm |
Carrier
Bucket loader support width | 1400 mm and 810 mm | 42 % more or 590 mm |
Loading shovel operational weight | 525000 kg and 195000 kg | 63 % more or 330000 kg |
Unloaded backhoe shovel operational weight with support 1 | 537000 kg and 200000 kg | 63 % more or 337000 kg |
Maximum travel speed | 3.7 km/h and 2.7 km/h | 27 % more or 1.0 km/h |
Neutral reasons:
Sizes
Width between caterpillar tracks | 5410 mm and 7000 mm |
Height to cab upper part | 7030 mm and 8760 mm |
Caterpillar track length on ground level | 5780 mm and 6400 mm |
Shovel boom/sections 1
Maximum cut height | 13410 mm and 17000 mm |
Backhoe shovel boom / section | Boom 28'7" (8700mm)/ Section 12'10" (3900mm) and boom 34'5" (10500mm) Section 18'1" (5500mm) |
Motor
Aspiration | Turbocharging with subsequent air cooling (by a cooling radiator) and turbocharging and cooling at the outlet |
Manufacturer | Komatsu and Cummins |
Model | SAA12V140E-3 and 2x K 1500-E |
Power measured at | 1800 rev / min and 1800 rev / min |
Loading bucket
Loading bucket | Boom 19'6" (5950mm)/ Section 14'7" (4450mm) and boom 26'2" (8000mm) Section 16'9" (5100mm) |
Maximum cut height | 14450 mm and 15300 mm |
Carrier
Track width | 4600 mm and 5600 mm |
Backhoe shovel support width 1 | 810 mm and 1400 mm |
Images
Sizes
2. Width between caterpillar tracks | 5410 mm | 2. Width between caterpillar tracks | 7000 mm |
4. Caterpillar track length on ground level | 5780 mm | 4. Caterpillar track length on ground level | 6400 mm |
5. Clearance | 825 mm | 5. Clearance | 1120 mm |
7. Height to cab upper part | 7030 mm | 7. Height to cab upper part | 8760 mm |
Loading bucket
17. Maximum cut height | 14450 mm | 17. Maximum cut height | 15300 mm |
18. Maximum unloading height | 9665 mm | 18. Maximum unloading height | 11800 mm |
19. Maximum digging radius | 13170 mm | 19. Maximum digging radius | 16200 mm |
20. Maximum excavation depth | 3190 mm | 20. Maximum excavation depth | 2400 mm |
Carrier
6. Track width | 4600 mm | 6. Track width | 5600 mm |
14. Bucket loader support width | 810 mm | 14. Bucket loader support width | 1400 mm |