Construction Machinery. Mini Digger Pel-Job EB300XT

Swing device

Rotation speed 10 rev / min

Sizes

Caterpillar track length on ground level 1440 mm
Height to cab upper part 2390 mm
Clearance 280 mm
Counterweight ground clearance 570 mm
Width to outside of caterpillar track 1480 mm
Rear platform swing radius 1260 mm

Shovel

Bucket initial volume 0.06 m3
Bucket minimum volume 0.04 m3
Maximum bucket volume 0.12 m3

Operation

Fuel Capacity 49 l.
Cooling system fluid volume 6 l.
Hydraulic system fluid volume 48 l.
Engine oil volume 5.2 l.
Operating voltage 12 V
Generator current strength 50 amperes
Hydraulic system overflow valve pressure 23000 kPa
Hydraulic pump flow rate 42.6 l/min
Working weight 3151 kg

Motor

Manufacturer Mitsubishi
Model S3L2
Full power 20.3 kW
Effective power 17.2 kW
Power measured at 2800 rev / min
Displacement 1.3 l.
Torque measured at 1600 rev / min
Maximum torque 77 Nm
Cylinders number 3

Carrier

Shoe dimensions 300 mm
Support rollers number on either side 1
Rolling bearings number on either side 3
Specific ground pressure 32.3 kPa
Maximum travel speed 3.6 km/h

Booms/sections features 2

Unit load-transfer height 2390 mm
Unit load-transfer length 4370 mm
Maximum excavation depth 3040 mm
Maximum radius along ground level 4910 mm
Maximum cut height 4640 mm
Maximum loading height 3430 mm
Maximum vertical wall digging depth 2440 mm

Booms/sections features 1

Unit load-transfer height 2390 mm
Unit load-transfer length 4370 mm
Maximum excavation depth 2740 mm
Maximum radius along ground level 4620 mm
Maximum cut height 4450 mm
Maximum loading height 3250 mm
Maximum vertical wall digging depth 2150 mm

Images

Sizes

2. Width to outside of caterpillar track 1480 mm
4. Caterpillar track length on ground level 1440 mm
5. Clearance 280 mm
7. Height to cab upper part 2390 mm
8. Rear platform swing radius 1260 mm
15. Counterweight ground clearance 570 mm
15. Counterweight ground clearance 570 mm

Carrier

14. Shoe dimensions 300 mm

Booms/sections features 1

10. Maximum loading height 3430 mm
11. Maximum radius along ground level 4910 mm
12. Maximum vertical wall digging depth 2440 mm
13. Maximum excavation depth 3040 mm
1. Unit load-transfer length 4370 mm
3. Unit load-transfer height 2390 mm
9. Maximum cut height 4450 mm
10. Maximum loading height 3250 mm
11. Maximum radius along ground level 4620 mm
12. Maximum vertical wall digging depth 2150 mm
13. Maximum excavation depth 2740 mm
1. Unit load-transfer length 4370 mm
3. Unit load-transfer height 2390 mm
9. Maximum cut height 4640 mm