vs.

      Caterpillar 317B L vs. Komatsu PC138USLC8

      7 reasons to buy Caterpillar 317B L:

      Sizes

      Width to outside of caterpillar track 2800 mm and 2590 mm 7 % more or 210 mm
      Clearance 470 mm and 395 mm 16 % more or 75 mm
      Counterweight ground clearance 1030 mm and 900 mm 13 % more or 130 mm

      Operation

      Fuel Capacity 280 l. and 200 l. 29 % more or 80 l.
      Hydraulic system fluid volume 188 l. and 69 l. 63 % more or 119 l.

      Motor

      Displacement 5 l. and 3.3 l. 34 % more or 1.7 l.
      Full power 81.3 kW and 72 kW 11 % more or 9.3 kW

      4 reasons to buy Komatsu PC138USLC8:

      Booms/sections features 2

      Maximum excavation depth 5900 mm and 5660 mm 4 % more or 240 mm
      Maximum vertical wall digging depth 5340 mm and 4160 mm 22 % more or 1180 mm

      Booms/sections features 1

      Maximum excavation depth 5480 mm and 5260 mm 4 % more or 220 mm
      Maximum vertical wall digging depth 4900 mm and 4010 mm 18 % more or 890 mm

      Neutral reasons:

      Sizes

      Height to cab upper part 6040 mm and 2815 mm
      Rear platform swing radius 2450 mm and 1545 mm
      Caterpillar track length on ground level 3265 mm and 3140 mm

      Operation

      Working weight 17300 kg and 14110 kg

      Motor

      Model 3046T and SAA4D95LE-5

      Images

      Sizes

      2. Width to outside of caterpillar track 2800 mm 2. Width to outside of caterpillar track 2590 mm
      4. Caterpillar track length on ground level 3265 mm 4. Caterpillar track length on ground level 3140 mm
      5. Clearance 470 mm 5. Clearance 395 mm
      7. Height to cab upper part 6040 mm 7. Height to cab upper part 2815 mm
      8. Rear platform swing radius 2450 mm 8. Rear platform swing radius 1545 mm
      15. Counterweight ground clearance 1030 mm 15. Counterweight ground clearance 900 mm

      Booms/sections features 1

      12. Maximum vertical wall digging depth 4010 mm 12. Maximum vertical wall digging depth 5340 mm
      13. Maximum excavation depth 5260 mm 13. Maximum excavation depth 5900 mm