vs.

      Hitachi ZX400LCH vs. Hyundai R360LC-7A

      12 reasons to buy Hitachi ZX400LCH:

      Swing device

      Rotation speed 10.7 rev / min and 9 rev / min 16 % more or 1.7 rev

      Sizes

      Clearance 560 mm and 550 mm 2 % more or 10 mm

      Operation

      Boom reach drive mechanism fluid volume 17 l. and 8 l. 53 % more or 9 l.
      Fuel Capacity 630 l. and 520 l. 17 % more or 110 l.
      Engine oil volume 41 l. and 31.7 l. 23 % more or 9.3 l.

      Motor

      Torque measured at 1500 rev / min and 1400 rev / min 7 % more or 100 rev
      Power measured at 1900 rev / min and 1850 rev / min 3 % more or 50 rev

      Carrier

      Maximum travel speed 5 km/h and 4.8 km/h 4 % more or 0.2 km/h

      Booms/sections features 1

      Maximum excavation depth 7310 mm and 6800 mm 7 % more or 510 mm
      Maximum radius along ground level 10900 mm and 10490 mm 4 % more or 410 mm
      Maximum loading height 7330 mm and 7270 mm 1 % more or 60 mm
      Maximum vertical wall digging depth 6770 mm and 5940 mm 12 % more or 830 mm

      11 reasons to buy Hyundai R360LC-7A:

      Sizes

      Counterweight ground clearance 1290 mm and 1260 mm 2 % more or 30 mm
      Width to outside of caterpillar track 3340 mm and 3190 mm 4 % more or 150 mm

      Operation

      Hydraulic system overflow valve pressure 35301.1 kPa and 34300 kPa 3 % more or 1001.1 kPa
      Cooling system fluid volume 45 l. and 32 l. 29 % more or 13 l.
      Hydraulic system fluid volume 380 l. and 374 l. 2 % more or 6 l.

      Motor

      Maximum torque 1355.8 Nm and 1080 Nm 20 % more or 275.8 Nm
      Effective power 202.1 kW and 202 kW 0 % more or 0.1 kW
      Displacement 8.8 l. and 7.8 l. 11 % more or 1.0 l.

      Carrier

      Rolling bearings number on either side 9 and 8 11 % more or 1
      Specific ground pressure 62.7 kPa and 73 kPa 14 % less or 10.3 kPa
      Track shoes number per side 51 and 49 4 % more or 2

      Neutral reasons:

      Sizes

      Rear platform swing radius 3370 mm and 3415 mm
      Caterpillar track length on ground level 4050 mm and 4340 mm
      Height to cab upper part 3390 mm and 3175 mm

      Shovel

      Bucket initial volume 1.6 m3 and 1.6 m3

      Operation

      Operating voltage 24 V and 24 V
      Working weight 39000 kg and 36100 kg
      Hydraulic pump flow rate 576 l/min and 576 l/min

      Motor

      Aspiration turbocharging and interstage cooler and turbocharging
      Cylinders number 6 and 6
      Manufacturer Isuzu and Cummins
      Model AH-6HK1X and QSL

      Carrier

      Support rollers number on either side 2 and 2
      Track width 2590 mm and 2740 mm
      Shoe dimensions 600 mm and 600 mm

      Booms/sections features 1

      Unit load-transfer height 3390 mm and 3700 mm
      Unit load-transfer length 10960 mm and 11240 mm
      Maximum cut height 10440 mm and 10470 mm

      Images

      Sizes

      7. Height to cab upper part 3390 mm 7. Height to cab upper part 3175 mm
      8. Rear platform swing radius 3370 mm 8. Rear platform swing radius 3415 mm
      15. Counterweight ground clearance 1260 mm 15. Counterweight ground clearance 1290 mm
      2. Width to outside of caterpillar track 3190 mm 2. Width to outside of caterpillar track 3340 mm
      4. Caterpillar track length on ground level 4050 mm 4. Caterpillar track length on ground level 4340 mm
      5. Clearance 560 mm 5. Clearance 550 mm

      Carrier

      6. Track width 2590 mm 6. Track width 2740 mm
      14. Shoe dimensions 600 mm 14. Shoe dimensions 600 mm

      Booms/sections features 1

      1. Unit load-transfer length 10960 mm 1. Unit load-transfer length 11050 mm
      13. Maximum excavation depth 7310 mm 13. Maximum excavation depth 7500 mm
      3. Unit load-transfer height 3390 mm 3. Unit load-transfer height 4270 mm
      9. Maximum cut height 10440 mm 9. Maximum cut height 11210 mm
      10. Maximum loading height 7330 mm 10. Maximum loading height 8030 mm
      11. Maximum radius along ground level 10900 mm 11. Maximum radius along ground level 12180 mm
      12. Maximum vertical wall digging depth 6770 mm 12. Maximum vertical wall digging depth 6340 mm