- Home/
- Comparison/
- Hydraulic Shovel/
- Kato HD1430IIILC vs. Terex TXC420LC-2
Kato HD1430IIILC vs. Terex TXC420LC-2
14 reasons to buy Kato HD1430IIILC:
Swing device
Rotation speed | 10 rev / min and 9.2 rev / min | 8 % more or 0.8 rev |
Operation
Hydraulic system overflow valve pressure | 32900 kPa and 31371.1 kPa | 5 % more or 1528.9 kPa |
Fuel Capacity | 580 l. and 550 l. | 5 % more or 30 l. |
Hydraulic pump flow rate | 602 l/min and 630 l/min | 4 % less or 28 l/min |
Hydraulic system fluid volume | 485 l. and 420 l. | 13 % more or 65 l. |
Boom reach drive mechanism fluid volume | 11.3 l. and 6 l. | 47 % more or 5.3 l. |
Motor
Power measured at | 2150 rev / min and 1800 rev / min | 16 % more or 350 rev |
Torque measured at | 1800 rev / min and 1300 rev / min | 28 % more or 500 rev |
Carrier
Maximum travel speed | 5.5 km/h and 5.3 km/h | 4 % more or 0.2 km/h |
Track shoes number per side | 51 and 50 | 2 % more or 1 |
Specific ground pressure | 58 kPa and 72.4 kPa | 20 % less or 14.4 kPa |
Booms/sections features 3
Maximum vertical wall digging depth | 7480 mm and 5140 mm | 31 % more or 2340 mm |
Booms/sections features 2
Maximum vertical wall digging depth | 6560 mm and 4350 mm | 34 % more or 2210 mm |
Booms/sections features 1
Maximum vertical wall digging depth | 5740 mm and 3650 mm | 36 % more or 2090 mm |
16 reasons to buy Terex TXC420LC-2:
Sizes
Width to outside of caterpillar track | 3350 mm and 3200 mm | 4 % more or 150 mm |
Clearance | 540 mm and 500 mm | 7 % more or 40 mm |
Counterweight ground clearance | 1265 mm and 1130 mm | 11 % more or 135 mm |
Shovel
Bucket initial volume | 1.9 m3 and 1.4 m3 | 26 % more or 0.5 m3 |
Maximum bucket volume | 2.2 m3 and 1.8 m3 | 18 % more or 0.4 m3 |
Operation
Cooling system fluid volume | 40 l. and 36 l. | 10 % more or 4 l. |
Engine oil volume | 44 l. and 32 l. | 27 % more or 12 l. |
Motor
Displacement | 11 l. and 7.5 l. | 32 % more or 3.5 l. |
Maximum torque | 1492.8 Nm and 831 Nm | 44 % more or 661.8 Nm |
Carrier
Rolling bearings number on either side | 9 and 8 | 11 % more or 1 |
Booms/sections features 3
Maximum loading height | 8200 mm and 7570 mm | 8 % more or 630 mm |
Maximum excavation depth | 8430 mm and 8400 mm | 0 % more or 30 mm |
Booms/sections features 2
Maximum excavation depth | 7730 mm and 7400 mm | 4 % more or 330 mm |
Maximum loading height | 7795 mm and 7280 mm | 7 % more or 515 mm |
Booms/sections features 1
Maximum loading height | 7460 mm and 7110 mm | 5 % more or 350 mm |
Maximum excavation depth | 6931 mm and 6720 mm | 3 % more or 211 mm |
Neutral reasons:
Sizes
Height to cab upper part | 3020 mm and 3154 mm |
Rear platform swing radius | 3460 mm and 3660 mm |
Operation
Working weight | 31100 kg and 40900.4 kg |
Operating voltage | 24 V and 24 V |
Motor
Manufacturer | Mitsubishi and Doosan |
Model | C 6D16-TLE2A and DV11 |
Aspiration | turbocharging and turbocharging, with subsequent cooling of charging air by oncoming air flow |
Cylinders number | 6 and 6 |
Carrier
Track width | 2600 mm and 2750 mm |
Shoe dimensions | 600 mm and 600 mm |
Support rollers number on either side | 2 and 2 |
Booms/sections features 3
Maximum cut height | 10610 mm and 11350 mm |
Booms/sections features 2
Maximum cut height | 10330 mm and 10920 mm |
Booms/sections features 1
Maximum cut height | 10140 mm and 10560 mm |
Images
Sizes
15. Counterweight ground clearance | 1130 mm | 15. Counterweight ground clearance | 1265 mm |
2. Width to outside of caterpillar track | 3200 mm | 2. Width to outside of caterpillar track | 3350 mm |
5. Clearance | 500 mm | 5. Clearance | 540 mm |
7. Height to cab upper part | 3020 mm | 7. Height to cab upper part | 3154 mm |
8. Rear platform swing radius | 3460 mm | 8. Rear platform swing radius | 3660 mm |
Carrier
6. Track width | 2600 mm | 6. Track width | 2750 mm |
14. Shoe dimensions | 600 mm | 14. Shoe dimensions | 600 mm |
Booms/sections features 1
9. Maximum cut height | 10610 mm | 9. Maximum cut height | 11350 mm |
10. Maximum loading height | 7570 mm | 10. Maximum loading height | 8200 mm |
12. Maximum vertical wall digging depth | 7480 mm | 12. Maximum vertical wall digging depth | 5140 mm |
13. Maximum excavation depth | 8400 mm | 13. Maximum excavation depth | 8430 mm |