- Home/
- Comparison/
- Hydraulic Shovel/
- Kobelco 200SR LC vs. Hyundai R250LC-7
Kobelco 200SR LC vs. Hyundai R250LC-7
12 reasons to buy Kobelco 200SR LC:
Sizes
Width to outside of caterpillar track | 3190 mm and 3180 mm | 0 % more or 10 mm |
Operation
Boom reach drive mechanism fluid volume | 7.6 l. and 6 l. | 21 % more or 1.6 l. |
Hydraulic system overflow valve pressure | 34335.9 kPa and 32336.4 kPa | 6 % more or 1999.5 kPa |
Hydraulic pump flow rate | 371 l/min and 448 l/min | 17 % less or 77 l/min |
Motor
Power measured at | 2200 rev / min and 2000 rev / min | 9 % more or 200 rev |
Carrier
Hook traction force | 199.2 kN and 216 kN | 8 % less or 16.8 kN |
Specific ground pressure | 34 kPa and 50 kPa | 32 % less or 16 kPa |
Booms/sections features 2
Maximum excavation depth | 6550 mm and 6450 mm | 2 % more or 100 mm |
Maximum loading height | 7660 mm and 6420 mm | 16 % more or 1240 mm |
Maximum vertical wall digging depth | 5800 mm and 5640 mm | 3 % more or 160 mm |
Booms/sections features 1
Maximum excavation depth | 6150 mm and 6050 mm | 2 % more or 100 mm |
Maximum loading height | 7360 mm and 6360 mm | 14 % more or 1000 mm |
13 reasons to buy Hyundai R250LC-7:
Swing device
Rotation speed | 12.6 rev / min and 11 rev / min | 13 % more or 1.6 rev |
Sizes
Clearance | 480 mm and 450 mm | 6 % more or 30 mm |
Counterweight ground clearance | 1115 mm and 1030 mm | 8 % more or 85 mm |
Operation
Fuel Capacity | 340 l. and 269.9 l. | 21 % more or 70.1 l. |
Cooling system fluid volume | 45 l. and 18.5 l. | 59 % more or 26.5 l. |
Hydraulic system fluid volume | 300 l. and 215 l. | 28 % more or 85 l. |
Engine oil volume | 24 l. and 12.9 l. | 46 % more or 11.1 l. |
Motor
Effective power | 121.5 kW and 91.7 kW | 25 % more or 29.8 kW |
Displacement | 5.9 l. and 4.3 l. | 27 % more or 1.6 l. |
Carrier
Maximum travel speed | 5.5 km/h and 5 km/h | 9 % more or 0.5 km/h |
Booms/sections features 2
Maximum radius along ground level | 9680 mm and 9190 mm | 5 % more or 490 mm |
Booms/sections features 1
Maximum radius along ground level | 9360 mm and 8800 mm | 6 % more or 560 mm |
Maximum vertical wall digging depth | 5480 mm and 5400 mm | 1 % more or 80 mm |
Neutral reasons:
Sizes
Height to cab upper part | 3060 mm and 2990 mm |
Rear platform swing radius | 1680 mm and 2965 mm |
Caterpillar track length on ground level | 3660 mm and 3830 mm |
Operation
Working weight | 21999.2 kg and 25219.7 kg |
Motor
Model | AA-4BG1TC and B5.9-C |
Manufacturer | Isuzu and Cummins |
Carrier
Track width | 2390 mm and 2580 mm |
Shoe dimensions | 800 mm and 600 mm |
Booms/sections features 2
Unit load-transfer length | 8180 mm and 10000 mm |
Maximum cut height | 10530 mm and 9460 mm |
Unit load-transfer height | 3060 mm and 3590 mm |
Booms/sections features 1
Unit load-transfer height | 3060 mm and 3530 mm |
Unit load-transfer length | 8200 mm and 10050 mm |
Maximum cut height | 10230 mm and 9450 mm |
Images
Sizes
7. Height to cab upper part | 3060 mm | 7. Height to cab upper part | 2990 mm |
8. Rear platform swing radius | 1680 mm | 8. Rear platform swing radius | 2965 mm |
15. Counterweight ground clearance | 1030 mm | 15. Counterweight ground clearance | 1115 mm |
2. Width to outside of caterpillar track | 3190 mm | 2. Width to outside of caterpillar track | 3180 mm |
4. Caterpillar track length on ground level | 3660 mm | 4. Caterpillar track length on ground level | 3830 mm |
5. Clearance | 450 mm | 5. Clearance | 480 mm |
Carrier
6. Track width | 2390 mm | 6. Track width | 2580 mm |
14. Shoe dimensions | 800 mm | 14. Shoe dimensions | 600 mm |
Booms/sections features 1
1. Unit load-transfer length | 8180 mm | 1. Unit load-transfer length | 9910 mm |
3. Unit load-transfer height | 3060 mm | 3. Unit load-transfer height | 3590 mm |
9. Maximum cut height | 10530 mm | 9. Maximum cut height | 9920 mm |
10. Maximum loading height | 7660 mm | 10. Maximum loading height | 6860 mm |
11. Maximum radius along ground level | 9190 mm | 11. Maximum radius along ground level | 10700 mm |
12. Maximum vertical wall digging depth | 5800 mm | 12. Maximum vertical wall digging depth | 6150 mm |
13. Maximum excavation depth | 6550 mm | 13. Maximum excavation depth | 7550 mm |