vs.

      Kobelco SK250 LC vs. Hitachi EX220-5

      16 reasons to buy Kobelco SK250 LC:

      Sizes

      Width to outside of caterpillar track 3390 mm and 2990 mm 12 % more or 400 mm

      Shovel

      Maximum bucket volume 1.7 m3 and 1.4 m3 18 % more or 0.3 m3
      Bucket initial volume 1.1 m3 and 1 m3 9 % more or 0.1 m3

      Operation

      Hydraulic system fluid volume 260 l. and 239 l. 8 % more or 21 l.

      Motor

      Effective power 131.2 kW and 116.3 kW 11 % more or 14.9 kW
      Power measured at 2100 rev / min and 2000 rev / min 5 % more or 100 rev

      Carrier

      Specific ground pressure 37 kPa and 49 kPa 24 % less or 12 kPa
      Maximum travel speed 6 km/h and 5.5 km/h 8 % more or 0.5 km/h

      Booms/sections features 2

      Maximum excavation depth 7730 mm and 6950 mm 10 % more or 780 mm
      Maximum radius along ground level 10820 mm and 10100 mm 7 % more or 720 mm
      Maximum loading height 7210 mm and 6760 mm 6 % more or 450 mm
      Maximum vertical wall digging depth 7010 mm and 6020 mm 14 % more or 990 mm

      Booms/sections features 1

      Maximum radius along ground level 10140 mm and 9530 mm 6 % more or 610 mm
      Maximum loading height 6850 mm and 6540 mm 5 % more or 310 mm
      Maximum excavation depth 7030 mm and 6300 mm 10 % more or 730 mm
      Maximum vertical wall digging depth 6210 mm and 5400 mm 13 % more or 810 mm

      7 reasons to buy Hitachi EX220-5:

      Swing device

      Rotation speed 13.5 rev / min and 11 rev / min 19 % more or 2.5 rev

      Sizes

      Counterweight ground clearance 1090 mm and 1060 mm 3 % more or 30 mm

      Operation

      Engine oil volume 26 l. and 24 l. 8 % more or 2 l.
      Cooling system fluid volume 23 l. and 22 l. 4 % more or 1 l.
      Hydraulic pump flow rate 408 l/min and 501 l/min 19 % less or 93 l/min
      Fuel Capacity 380 l. and 340 l. 11 % more or 40 l.

      Motor

      Displacement 6.7 l. and 5.9 l. 12 % more or 0.8 l.

      Neutral reasons:

      Sizes

      Height to cab upper part 2940 mm and 2940 mm
      Clearance 460 mm and 460 mm
      Rear platform swing radius 2980 mm and 2940 mm
      Caterpillar track length on ground level 3850 mm and 3460 mm

      Operation

      Hydraulic system overflow valve pressure 34335.9 kPa and 34335.9 kPa
      Working weight 25130 kg and 22498.2 kg

      Motor

      Manufacturer Mitsubishi and Hino
      Model 6D34-TLEG and H07C-TD

      Carrier

      Shoe dimensions 800 mm and 600 mm
      Track width 2590 mm and 2390 mm

      Booms/sections features 2

      Unit load-transfer length 10070 mm and 10140 mm
      Maximum cut height 10150 mm and 9630 mm
      Unit load-transfer height 3160 mm and 3100 mm

      Booms/sections features 1

      Maximum cut height 9770 mm and 9410 mm
      Unit load-transfer height 3050 mm and 3290 mm
      Unit load-transfer length 10080 mm and 10260 mm

      Images

      Sizes

      4. Caterpillar track length on ground level 3850 mm 4. Caterpillar track length on ground level 3460 mm
      5. Clearance 460 mm 5. Clearance 460 mm
      7. Height to cab upper part 2940 mm 7. Height to cab upper part 2940 mm
      8. Rear platform swing radius 2980 mm 8. Rear platform swing radius 2940 mm
      15. Counterweight ground clearance 1060 mm 15. Counterweight ground clearance 1090 mm
      2. Width to outside of caterpillar track 3390 mm 2. Width to outside of caterpillar track 2990 mm

      Carrier

      14. Shoe dimensions 800 mm 14. Shoe dimensions 600 mm
      6. Track width 2590 mm 6. Track width 2390 mm

      Booms/sections features 1

      1. Unit load-transfer length 10070 mm 1. Unit load-transfer length 10200 mm
      3. Unit load-transfer height 3160 mm 3. Unit load-transfer height 3320 mm
      9. Maximum cut height 10150 mm 9. Maximum cut height 9990 mm
      10. Maximum loading height 7210 mm 10. Maximum loading height 7100 mm
      11. Maximum radius along ground level 10820 mm 11. Maximum radius along ground level 10730 mm
      12. Maximum vertical wall digging depth 7010 mm 12. Maximum vertical wall digging depth 6740 mm
      13. Maximum excavation depth 7730 mm 13. Maximum excavation depth 7590 mm