vs.

      Kobelco SK260LC-8 vs. Hitachi EX225USRLC

      8 reasons to buy Kobelco SK260LC-8:

      Sizes

      Width to outside of caterpillar track 3290 mm and 2990 mm 9 % more or 300 mm
      Clearance 460 mm and 450 mm 2 % more or 10 mm

      Motor

      Power measured at 2000 rev / min and 1950 rev / min 2 % more or 50 rev

      Carrier

      Maximum travel speed 5.8 km/h and 5.3 km/h 9 % more or 0.5 km/h

      Booms/sections features 1

      Maximum radius along ground level 10140 mm and 9910 mm 2 % more or 230 mm
      Maximum loading height 6880 mm and 6780 mm 1 % more or 100 mm
      Maximum vertical wall digging depth 6150 mm and 6050 mm 2 % more or 100 mm
      Maximum excavation depth 7000 mm and 6670 mm 5 % more or 330 mm

      1 reasons to buy Hitachi EX225USRLC:

      Operation

      Hydraulic system overflow valve pressure 34335.9 kPa and 34300 kPa 0 % more or 35.9 kPa

      Neutral reasons:

      Sizes

      Rear platform swing radius 3020 mm and 2000 mm
      Caterpillar track length on ground level 3850 mm and 3660 mm

      Operation

      Working weight 25200 kg and 22498.2 kg

      Motor

      Manufacturer Hino and Isuzu
      Model J05E and A-6BG1T

      Carrier

      Shoe dimensions 600 mm and 600 mm

      Booms/sections features 1

      Unit load-transfer height 3200 mm and 2970 mm
      Unit load-transfer length 10120 mm and 9010 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 3290 mm 2. Width to outside of caterpillar track 2990 mm
      4. Caterpillar track length on ground level 3850 mm 4. Caterpillar track length on ground level 3660 mm
      5. Clearance 460 mm 5. Clearance 450 mm
      8. Rear platform swing radius 3020 mm 8. Rear platform swing radius 2000 mm

      Carrier

      14. Shoe dimensions 600 mm 14. Shoe dimensions 600 mm

      Booms/sections features 1

      10. Maximum loading height 6880 mm 10. Maximum loading height 6780 mm
      11. Maximum radius along ground level 10140 mm 11. Maximum radius along ground level 9910 mm
      12. Maximum vertical wall digging depth 6150 mm 12. Maximum vertical wall digging depth 6050 mm
      13. Maximum excavation depth 7000 mm 13. Maximum excavation depth 6670 mm
      1. Unit load-transfer length 10120 mm 1. Unit load-transfer length 9010 mm
      3. Unit load-transfer height 3200 mm 3. Unit load-transfer height 2970 mm