vs.

      Kobelco SK290 LC vs. Terex TXC340LC-1

      10 reasons to buy Kobelco SK290 LC:

      Swing device

      Rotation speed 10 rev / min and 8.9 rev / min 11 % more or 1.1 rev

      Sizes

      Width to outside of caterpillar track 3400 mm and 3200 mm 6 % more or 200 mm
      Counterweight ground clearance 1190 mm and 1175 mm 1 % more or 15 mm

      Operation

      Hydraulic pump flow rate 505 l/min and 532 l/min 5 % less or 27 l/min
      Engine oil volume 32 l. and 28 l. 12 % more or 4 l.
      Hydraulic system overflow valve pressure 34335.9 kPa and 32336.4 kPa 6 % more or 1999.5 kPa

      Motor

      Power measured at 2100 rev / min and 1900 rev / min 10 % more or 200 rev

      Carrier

      Specific ground pressure 43 kPa and 63.4 kPa 32 % less or 20.4 kPa
      Maximum travel speed 5.6 km/h and 4.6 km/h 18 % more or 1.0 km/h

      Booms/sections features 1

      Maximum vertical wall digging depth 6350 mm and 6200 mm 2 % more or 150 mm

      13 reasons to buy Terex TXC340LC-1:

      Shovel

      Bucket initial volume 1.5 m3 and 1.2 m3 20 % more or 0.3 m3

      Operation

      Fuel Capacity 550 l. and 420 l. 24 % more or 130 l.
      Cooling system fluid volume 58 l. and 28 l. 52 % more or 30 l.
      Hydraulic system fluid volume 460 l. and 351 l. 24 % more or 109 l.

      Motor

      Effective power 184.2 kW and 141.7 kW 23 % more or 42.5 kW
      Displacement 11.1 l. and 7.5 l. 32 % more or 3.6 l.

      Booms/sections features 2

      Maximum radius along ground level 11810 mm and 11250 mm 5 % more or 560 mm
      Maximum loading height 7640 mm and 6940 mm 9 % more or 700 mm
      Maximum vertical wall digging depth 6990 mm and 6290 mm 10 % more or 700 mm
      Maximum excavation depth 8480 mm and 8120 mm 4 % more or 360 mm

      Booms/sections features 1

      Maximum loading height 7270 mm and 7150 mm 2 % more or 120 mm
      Maximum excavation depth 7670 mm and 7230 mm 6 % more or 440 mm
      Maximum radius along ground level 11040 mm and 10570 mm 4 % more or 470 mm

      Neutral reasons:

      Sizes

      Height to cab upper part 3120 mm and 3065 mm
      Clearance 500 mm and 500 mm
      Rear platform swing radius 3070 mm and 3200 mm
      Caterpillar track length on ground level 4010 mm and 4010 mm

      Shovel

      Maximum bucket volume 1.8 m3 and 1.8 m3

      Operation

      Working weight 30095.9 kg and 34700 kg

      Motor

      Manufacturer Mitsubishi and Daewoo
      Model 6D16-TLEG and DE12TIS

      Carrier

      Shoe dimensions 800 mm and 600 mm
      Track width 8600 mm and 2600 mm

      Booms/sections features 2

      Maximum cut height 10010 mm and 10820 mm

      Booms/sections features 1

      Unit load-transfer height 3220 mm and 3365 mm
      Unit load-transfer length 10330 mm and 10620 mm
      Maximum cut height 10060 mm and 10440 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 3400 mm 2. Width to outside of caterpillar track 3200 mm
      4. Caterpillar track length on ground level 4010 mm 4. Caterpillar track length on ground level 4010 mm
      5. Clearance 500 mm 5. Clearance 500 mm
      7. Height to cab upper part 3120 mm 7. Height to cab upper part 3065 mm
      8. Rear platform swing radius 3070 mm 8. Rear platform swing radius 3200 mm
      15. Counterweight ground clearance 1190 mm 15. Counterweight ground clearance 1175 mm

      Carrier

      6. Track width 8600 mm 6. Track width 2600 mm
      14. Shoe dimensions 800 mm 14. Shoe dimensions 600 mm

      Booms/sections features 1

      1. Unit load-transfer length 10160 mm 1. Unit load-transfer length 10620 mm
      3. Unit load-transfer height 4060 mm 3. Unit load-transfer height 3365 mm
      9. Maximum cut height 10010 mm 9. Maximum cut height 10820 mm
      10. Maximum loading height 6940 mm 10. Maximum loading height 7640 mm
      11. Maximum radius along ground level 11250 mm 11. Maximum radius along ground level 11810 mm
      12. Maximum vertical wall digging depth 6290 mm 12. Maximum vertical wall digging depth 6990 mm
      13. Maximum excavation depth 8120 mm 13. Maximum excavation depth 8480 mm