vs.

      Komatsu PC220-6 EXCEL vs. Kato HD1023III

      2 reasons to buy Komatsu PC220-6 EXCEL:

      Swing device

      Rotation speed 12.4 rev / min and 11 rev / min 11 % more or 1.4 rev

      Operation

      Hydraulic pump flow rate 432 l/min and 494 l/min 13 % less or 62 l/min

      23 reasons to buy Kato HD1023III:

      Sizes

      Width to outside of caterpillar track 2990 mm and 2880 mm 4 % more or 110 mm
      Clearance 480 mm and 440 mm 8 % more or 40 mm
      Counterweight ground clearance 1100 mm and 1085 mm 1 % more or 15 mm

      Shovel

      Maximum bucket volume 1.5 m3 and 1.3 m3 13 % more or 0.2 m3

      Operation

      Fuel Capacity 380 l. and 340 l. 11 % more or 40 l.
      Hydraulic system fluid volume 290 l. and 166 l. 43 % more or 124 l.
      Hydraulic system overflow valve pressure 32900 kPa and 31853.8 kPa 3 % more or 1046.2 kPa

      Motor

      Full power 125 kW and 114 kW 9 % more or 11 kW
      Power measured at 2150 rev / min and 2100 rev / min 2 % more or 50 rev

      Carrier

      Maximum travel speed 5.5 km/h and 3.8 km/h 31 % more or 1.7 km/h
      Specific ground pressure 50 kPa and 57.2 kPa 13 % less or 7.2 kPa

      Booms/sections features 4

      Maximum excavation depth 8010 mm and 7375 mm 8 % more or 635 mm
      Maximum loading height 7440 mm and 6720 mm 10 % more or 720 mm
      Maximum vertical wall digging depth 7190 mm and 6440 mm 10 % more or 750 mm

      Booms/sections features 3

      Maximum excavation depth 7010 mm and 6920 mm 1 % more or 90 mm
      Maximum loading height 6990 mm and 6515 mm 7 % more or 475 mm
      Maximum vertical wall digging depth 6250 mm and 6010 mm 4 % more or 240 mm

      Booms/sections features 2

      Maximum loading height 6810 mm and 6215 mm 9 % more or 595 mm
      Maximum vertical wall digging depth 5750 mm and 5145 mm 11 % more or 605 mm
      Maximum excavation depth 6520 mm and 6370 mm 2 % more or 150 mm

      Booms/sections features 1

      Maximum excavation depth 5950 mm and 5880 mm 1 % more or 70 mm
      Maximum loading height 6550 mm and 6120 mm 7 % more or 430 mm
      Maximum vertical wall digging depth 5100 mm and 4800 mm 6 % more or 300 mm

      Neutral reasons:

      Sizes

      Rear platform swing radius 2860 mm and 2940 mm
      Caterpillar track length on ground level 3445 mm and 3460 mm
      Height to cab upper part 2905 mm and 2940 mm

      Shovel

      Bucket initial volume 1 m3 and 1 m3

      Operation

      Working weight 21910 kg and 23000 kg

      Motor

      Manufacturer Komatsu and Mitsubishi
      Model SA6D102E and C 6D34 TLE2A
      Displacement 5.9 l. and 5.9 l.
      Cylinders number 6 and 6

      Carrier

      Track width 2380 mm and 2390 mm
      Shoe dimensions 500 mm and 600 mm

      Booms/sections features 4

      Maximum cut height 9620 mm and 10500 mm

      Booms/sections features 3

      Maximum cut height 9380 mm and 10060 mm

      Booms/sections features 2

      Maximum cut height 9150 mm and 9880 mm

      Booms/sections features 1

      Maximum cut height 9070 mm and 9600 mm

      Images

      Sizes

      15. Counterweight ground clearance 1085 mm 15. Counterweight ground clearance 1100 mm
      2. Width to outside of caterpillar track 2880 mm 2. Width to outside of caterpillar track 2990 mm
      4. Caterpillar track length on ground level 3445 mm 4. Caterpillar track length on ground level 3460 mm
      5. Clearance 440 mm 5. Clearance 480 mm
      7. Height to cab upper part 2905 mm 7. Height to cab upper part 2940 mm
      8. Rear platform swing radius 2860 mm 8. Rear platform swing radius 2940 mm

      Carrier

      6. Track width 2380 mm 6. Track width 2390 mm
      14. Shoe dimensions 500 mm 14. Shoe dimensions 600 mm

      Booms/sections features 1

      9. Maximum cut height 9620 mm 9. Maximum cut height 10500 mm
      10. Maximum loading height 6720 mm 10. Maximum loading height 7440 mm
      12. Maximum vertical wall digging depth 6010 mm 12. Maximum vertical wall digging depth 6250 mm
      13. Maximum excavation depth 7375 mm 13. Maximum excavation depth 8010 mm