- Home/
- Comparison/
- Hydraulic Shovel/
- New Holland E145 vs. Komatsu PC1800-6
New Holland E145 vs. Komatsu PC1800-6
7 reasons to buy New Holland E145:
Swing device
Rotation speed | 12 rev / min and 4.5 rev / min | 62 % more or 7.5 rev |
Operation
Hydraulic system overflow valve pressure | 34300 kPa and 31371.1 kPa | 9 % more or 2928.9 kPa |
Hydraulic pump flow rate | 242 l/min and 1676 l/min | 86 % less or 1434 l/min |
Motor
Power measured at | 2100 rev / min and 1800 rev / min | 14 % more or 300 rev |
Carrier
Specific ground pressure | 39 kPa and 170 kPa | 77 % less or 131 kPa |
Maximum travel speed | 6 km/h and 2.7 km/h | 55 % more or 3.3 km/h |
Booms/sections features 1
Maximum vertical wall digging depth | 4963 mm and 2740 mm | 45 % more or 2223 mm |
18 reasons to buy Komatsu PC1800-6:
Sizes
Width to outside of caterpillar track | 5410 mm and 2590 mm | 52 % more or 2820 mm |
Counterweight ground clearance | 2080 mm and 929 mm | 55 % more or 1151 mm |
Clearance | 810 mm and 461 mm | 43 % more or 349 mm |
Operation
Fuel Capacity | 2750 l. and 208 l. | 92 % more or 2542 l. |
Cooling system fluid volume | 170 l. and 18 l. | 89 % more or 152 l. |
Hydraulic system fluid volume | 1500 l. and 170 l. | 89 % more or 1330 l. |
Engine oil volume | 110 l. and 15 l. | 86 % more or 95 l. |
Motor
Displacement | 15.2 l. and 3.9 l. | 74 % more or 11.3 l. |
Cylinders number | 6 and 4 | 33 % more or 2 |
Carrier
Support rollers number on either side | 3 and 2 | 33 % more or 1 |
Rolling bearings number on either side | 8 and 7 | 12 % more or 1 |
Booms/sections features 2
Maximum excavation depth | 10000 mm and 5580 mm | 44 % more or 4420 mm |
Maximum radius along ground level | 16040 mm and 8191 mm | 49 % more or 7849 mm |
Maximum loading height | 8730 mm and 6300 mm | 28 % more or 2430 mm |
Maximum vertical wall digging depth | 5530 mm and 5348 mm | 3 % more or 182 mm |
Booms/sections features 1
Maximum excavation depth | 9265 mm and 5230 mm | 44 % more or 4035 mm |
Maximum radius along ground level | 15305 mm and 7854 mm | 49 % more or 7451 mm |
Maximum loading height | 8620 mm and 6074 mm | 30 % more or 2546 mm |
Neutral reasons:
Sizes
Height to cab upper part | 2800 mm and 6510 mm |
Rear platform swing radius | 1800 mm and 6235 mm |
Caterpillar track length on ground level | 3037 mm and 5780 mm |
Operation
Working weight | 14390 kg and 180000 kg |
Motor
Model | CNH F4BE0454B*D601 and SAA6D140E-3 x2 |
Carrier
Shoe dimensions | 600 mm and 810 mm |
Track width | 1990 mm and 4600 mm |
Booms/sections features 2
Unit load-transfer height | 2800 mm and 6850 mm |
Unit load-transfer length | 7517 mm and 17470 mm |
Maximum cut height | 8650 mm and 13550 mm |
Booms/sections features 1
Unit load-transfer height | 2800 mm and 6745 mm |
Unit load-transfer length | 7501 mm and 17185 mm |
Maximum cut height | 8419 mm and 13380 mm |
Images
Sizes
2. Width to outside of caterpillar track | 2590 mm | 2. Width to outside of caterpillar track | 5410 mm |
4. Caterpillar track length on ground level | 3037 mm | 4. Caterpillar track length on ground level | 5780 mm |
5. Clearance | 461 mm | 5. Clearance | 810 mm |
7. Height to cab upper part | 2800 mm | 7. Height to cab upper part | 6510 mm |
8. Rear platform swing radius | 1800 mm | 8. Rear platform swing radius | 6235 mm |
15. Counterweight ground clearance | 929 mm | 15. Counterweight ground clearance | 2080 mm |
Carrier
6. Track width | 1990 mm | 6. Track width | 4600 mm |
14. Shoe dimensions | 600 mm | 14. Shoe dimensions | 810 mm |
Booms/sections features 1
1. Unit load-transfer length | 7501 mm | 1. Unit load-transfer length | 17470 mm |
3. Unit load-transfer height | 2800 mm | 3. Unit load-transfer height | 6850 mm |
9. Maximum cut height | 8419 mm | 9. Maximum cut height | 13550 mm |
10. Maximum loading height | 6074 mm | 10. Maximum loading height | 8730 mm |
12. Maximum vertical wall digging depth | 4963 mm | 12. Maximum vertical wall digging depth | 5530 mm |
11. Maximum radius along ground level | 7854 mm | 11. Maximum radius along ground level | 16040 mm |
13. Maximum excavation depth | 5230 mm | 13. Maximum excavation depth | 10000 mm |


