- Home/
- Comparison/
- Hydraulic Shovel/
- Tata Hitachi ZAXIS850 vs. Sany SY135
Tata Hitachi ZAXIS850 vs. Sany SY135
6 reasons to buy Tata Hitachi ZAXIS850:
Sizes
| Width to outside of caterpillar track | 4100 mm and 2550 mm | 38 % more or 1550 mm |
| Clearance | 890 mm and 400 mm | 55 % more or 490 mm |
Motor
| Displacement | 15.7 l. and 4.3 l. | 73 % more or 11.4 l. |
Booms/sections features 1
| Maximum loading height | 8130 mm and 6167 mm | 24 % more or 1963 mm |
| Maximum excavation depth | 7140 mm and 5505 mm | 23 % more or 1635 mm |
| Maximum radius along ground level | 12020 mm and 8320 mm | 31 % more or 3700 mm |
3 reasons to buy Sany SY135:
Operation
| Hydraulic pump flow rate | 242 l/min and 1056 l/min | 77 % less or 814 l/min |
Carrier
| Maximum travel speed | 5.5 km/h and 4.1 km/h | 25 % more or 1.4 km/h |
Booms/sections features 1
| Maximum vertical wall digging depth | 4850 mm and 4100 mm | 15 % more or 750 mm |
Neutral reasons:
Sizes
| Rear platform swing radius | 4600 mm and 2500 mm |
| Caterpillar track length on ground level | 4590 mm and 2880 mm |
Operation
| Working weight | 80500 kg and 13500 kg |
Motor
| Model | AH-6WG1XYSA-03 and BB-4BG1TRP |
| Manufacturer | Isuzu and Isuzu |
Carrier
| Shoe dimensions | 650 mm and 500 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 4100 mm | 2. Width to outside of caterpillar track | 2550 mm |
| 4. Caterpillar track length on ground level | 4590 mm | 4. Caterpillar track length on ground level | 2880 mm |
| 5. Clearance | 890 mm | 5. Clearance | 400 mm |
| 8. Rear platform swing radius | 4600 mm | 8. Rear platform swing radius | 2500 mm |
Carrier
| 14. Shoe dimensions | 650 mm | 14. Shoe dimensions | 500 mm |
Booms/sections features 1
| 10. Maximum loading height | 9740 mm | 10. Maximum loading height | 6167 mm |
| 11. Maximum radius along ground level | 14640 mm | 11. Maximum radius along ground level | 8320 mm |
| 12. Maximum vertical wall digging depth | 8480 mm | 12. Maximum vertical wall digging depth | 4850 mm |
| 13. Maximum excavation depth | 9570 mm | 13. Maximum excavation depth | 5505 mm |