vs.

      Bobcat 442 vs. Hitachi ZX75US-3

      7 reasons to buy Bobcat 442:

      Sizes

      Width to outside of caterpillar track 2337 mm and 2320 mm 1 % more or 17 mm

      Motor

      Full power 54.4 kW and 40.5 kW 26 % more or 13.9 kW
      Power measured at 2200 rev / min and 2000 rev / min 9 % more or 200 rev
      Displacement 3.2 l. and 2.2 l. 31 % more or 1.0 l.

      Carrier

      Maximum travel speed 5.2 km/h and 5 km/h 4 % more or 0.2 km/h

      Booms/sections features 1

      Maximum excavation depth 4250 mm and 4110 mm 3 % more or 140 mm
      Maximum radius along ground level 7360 mm and 6260 mm 15 % more or 1100 mm

      3 reasons to buy Hitachi ZX75US-3:

      Operation

      Hydraulic pump flow rate 159 l/min and 224 l/min 29 % less or 65 l/min

      Booms/sections features 1

      Maximum loading height 5120 mm and 4160 mm 19 % more or 960 mm
      Maximum vertical wall digging depth 3670 mm and 2630 mm 28 % more or 1040 mm

      Neutral reasons:

      Operation

      Working weight 7500 kg and 7200 kg

      Motor

      Manufacturer Deutz and Isuzu
      Model KHD-BF-4M-2011E and AU-4LE2X

      Carrier

      Shoe dimensions 457.2 mm and 450 mm

      Booms/sections features 1

      Unit load-transfer height 2718.8 mm and 2690 mm
      Unit load-transfer length 6028.9 mm and 5870 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 2337 mm 2. Width to outside of caterpillar track 2320 mm

      Carrier

      14. Shoe dimensions 457.2 mm 14. Shoe dimensions 450 mm

      Booms/sections features 1

      1. Unit load-transfer length 6028.9 mm 1. Unit load-transfer length 5870 mm
      3. Unit load-transfer height 2718.8 mm 3. Unit load-transfer height 2690 mm
      10. Maximum loading height 4160 mm 10. Maximum loading height 5120 mm
      11. Maximum radius along ground level 7360 mm 11. Maximum radius along ground level 6260 mm
      12. Maximum vertical wall digging depth 2630 mm 12. Maximum vertical wall digging depth 3670 mm
      13. Maximum excavation depth 4250 mm 13. Maximum excavation depth 4110 mm