- Home/
- Comparison/
- Medium-Sized Excavator/
- Bobcat 442 vs. Hitachi ZX75US-3
Bobcat 442 vs. Hitachi ZX75US-3
7 reasons to buy Bobcat 442:
Sizes
| Width to outside of caterpillar track | 2337 mm and 2320 mm | 1 % more or 17 mm |
Motor
| Full power | 54.4 kW and 40.5 kW | 26 % more or 13.9 kW |
| Power measured at | 2200 rev / min and 2000 rev / min | 9 % more or 200 rev |
| Displacement | 3.2 l. and 2.2 l. | 31 % more or 1.0 l. |
Carrier
| Maximum travel speed | 5.2 km/h and 5 km/h | 4 % more or 0.2 km/h |
Booms/sections features 1
| Maximum excavation depth | 4250 mm and 4110 mm | 3 % more or 140 mm |
| Maximum radius along ground level | 7360 mm and 6260 mm | 15 % more or 1100 mm |
3 reasons to buy Hitachi ZX75US-3:
Operation
| Hydraulic pump flow rate | 159 l/min and 224 l/min | 29 % less or 65 l/min |
Booms/sections features 1
| Maximum loading height | 5120 mm and 4160 mm | 19 % more or 960 mm |
| Maximum vertical wall digging depth | 3670 mm and 2630 mm | 28 % more or 1040 mm |
Neutral reasons:
Operation
| Working weight | 7500 kg and 7200 kg |
Motor
| Manufacturer | Deutz and Isuzu |
| Model | KHD-BF-4M-2011E and AU-4LE2X |
Carrier
| Shoe dimensions | 457.2 mm and 450 mm |
Booms/sections features 1
| Unit load-transfer height | 2718.8 mm and 2690 mm |
| Unit load-transfer length | 6028.9 mm and 5870 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 2337 mm | 2. Width to outside of caterpillar track | 2320 mm |
Carrier
| 14. Shoe dimensions | 457.2 mm | 14. Shoe dimensions | 450 mm |
Booms/sections features 1
| 1. Unit load-transfer length | 6028.9 mm | 1. Unit load-transfer length | 5870 mm |
| 3. Unit load-transfer height | 2718.8 mm | 3. Unit load-transfer height | 2690 mm |
| 10. Maximum loading height | 4160 mm | 10. Maximum loading height | 5120 mm |
| 11. Maximum radius along ground level | 7360 mm | 11. Maximum radius along ground level | 6260 mm |
| 12. Maximum vertical wall digging depth | 2630 mm | 12. Maximum vertical wall digging depth | 3670 mm |
| 13. Maximum excavation depth | 4250 mm | 13. Maximum excavation depth | 4110 mm |