- Home/
- Comparison/
- Medium-Sized Excavator/
- Hitachi ZX50U-2 vs. Link-Belt 80 Spin Ace Level III
Hitachi ZX50U-2 vs. Link-Belt 80 Spin Ace Level III
3 reasons to buy Hitachi ZX50U-2:
Operation
| Hydraulic pump flow rate | 125 l/min and 136.3 l/min | 8 % less or 11.3 l/min |
Motor
| Power measured at | 2500 rev / min and 2000 rev / min | 20 % more or 500 rev |
Carrier
| Specific ground pressure | 30 kPa and 38 kPa | 21 % less or 8 kPa |
18 reasons to buy Link-Belt 80 Spin Ace Level III:
Swing device
| Rotation speed | 9.5 rev / min and 9.3 rev / min | 2 % more or 0.2 rev |
Sizes
| Width to outside of caterpillar track | 2320 mm and 2000 mm | 14 % more or 320 mm |
| Clearance | 360 mm and 335 mm | 7 % more or 25 mm |
Operation
| Cooling system fluid volume | 10.2 l. and 6.6 l. | 35 % more or 3.6 l. |
| Hydraulic system fluid volume | 97.3 l. and 90 l. | 8 % more or 7.3 l. |
| Engine oil volume | 9 l. and 8.6 l. | 4 % more or 0.4 l. |
| Fuel Capacity | 100 l. and 70 l. | 30 % more or 30 l. |
| Hydraulic system overflow valve pressure | 29371.6 kPa and 24500 kPa | 17 % more or 4871.6 kPa |
Motor
| Effective power | 40.3 kW and 29.8 kW | 26 % more or 10.5 kW |
| Maximum torque | 210.2 Nm and 138 Nm | 34 % more or 72.2 Nm |
Carrier
| Maximum travel speed | 5.1 km/h and 4.5 km/h | 12 % more or 0.6 km/h |
| Rolling bearings number on either side | 5 and 4 | 20 % more or 1 |
Booms/sections features 2
| Maximum loading height | 4600 mm and 4330 mm | 6 % more or 270 mm |
| Maximum excavation depth | 4590 mm and 3860 mm | 16 % more or 730 mm |
| Maximum vertical wall digging depth | 3550 mm and 3160 mm | 11 % more or 390 mm |
Booms/sections features 1
| Maximum excavation depth | 4180 mm and 3600 mm | 14 % more or 580 mm |
| Maximum loading height | 4390 mm and 4100 mm | 7 % more or 290 mm |
| Maximum vertical wall digging depth | 3080 mm and 2820 mm | 8 % more or 260 mm |
Neutral reasons:
Sizes
| Height to cab upper part | 2510 mm and 2700 mm |
| Caterpillar track length on ground level | 2000 mm and 2210 mm |
Operation
| Working weight | 4730 kg and 8430 kg |
| Operating voltage | 12 V and 24 V |
Motor
| Manufacturer | Yanmar and Isuzu |
| Model | 4TNV88 and AU-4LE2X |
| Displacement | 2.2 l. and 2.2 l. |
| Torque measured at | 1500 rev / min and 1500 rev / min |
| Cylinders number | 4 and 4 |
Carrier
| Track width | 1600 mm and 1870 mm |
| Shoe dimensions | 400 mm and 450 mm |
| Support rollers number on either side | 1 and 1 |
Booms/sections features 2
| Maximum cut height | 6020 mm and 6600 mm |
| Unit load-transfer height | 2510 mm and 2700 mm |
| Unit load-transfer length | 5520 mm and 6740 mm |
Booms/sections features 1
| Maximum cut height | 5770 mm and 6390 mm |
| Unit load-transfer height | 2510 mm and 2700 mm |
| Unit load-transfer length | 5460 mm and 6650 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 2000 mm | 2. Width to outside of caterpillar track | 2320 mm |
| 4. Caterpillar track length on ground level | 2000 mm | 4. Caterpillar track length on ground level | 2210 mm |
| 5. Clearance | 335 mm | 5. Clearance | 360 mm |
| 7. Height to cab upper part | 2510 mm | 7. Height to cab upper part | 2700 mm |
Carrier
| 14. Shoe dimensions | 400 mm | 14. Shoe dimensions | 450 mm |
| 6. Track width | 1600 mm | 6. Track width | 1870 mm |
Booms/sections features 1
| 1. Unit load-transfer length | 5520 mm | 1. Unit load-transfer length | 6740 mm |
| 3. Unit load-transfer height | 2510 mm | 3. Unit load-transfer height | 2700 mm |
| 9. Maximum cut height | 6020 mm | 9. Maximum cut height | 6600 mm |
| 10. Maximum loading height | 4330 mm | 10. Maximum loading height | 4600 mm |
| 12. Maximum vertical wall digging depth | 3160 mm | 12. Maximum vertical wall digging depth | 3550 mm |
| 13. Maximum excavation depth | 3860 mm | 13. Maximum excavation depth | 4590 mm |