- Home/
- Comparison/
- Medium-Sized Excavator/
- Kobelco SK70SR-2 vs. John Deere 50D
Kobelco SK70SR-2 vs. John Deere 50D
5 reasons to buy Kobelco SK70SR-2:
Sizes
| Width to outside of caterpillar track | 2320 mm and 2000 mm | 14 % more or 320 mm |
| Clearance | 360 mm and 335 mm | 7 % more or 25 mm |
Carrier
| Maximum travel speed | 5.3 km/h and 4.5 km/h | 15 % more or 0.8 km/h |
Booms/sections features 1
| Maximum excavation depth | 4160 mm and 3600 mm | 13 % more or 560 mm |
| Maximum loading height | 5330 mm and 4100 mm | 23 % more or 1230 mm |
2 reasons to buy John Deere 50D:
Operation
| Hydraulic pump flow rate | 125 l/min and 132 l/min | 5 % less or 7 l/min |
Motor
| Power measured at | 2500 rev / min and 2200 rev / min | 12 % more or 300 rev |
Neutral reasons:
Sizes
| Rear platform swing radius | 1290 mm and 1000 mm |
| Caterpillar track length on ground level | 2240 mm and 2000 mm |
Operation
| Working weight | 7470 kg and 4730 kg |
Motor
| Manufacturer | Isuzu and Yanmar |
| Model | AU-4LE2X and 4TNV88 |
| Displacement | 2.2 l. and 2.2 l. |
| Cylinders number | 4 and 4 |
Carrier
| Shoe dimensions | 450 mm and 400 mm |
Booms/sections features 1
| Unit load-transfer height | 2740 mm and 2510 mm |
| Unit load-transfer length | 5830 mm and 5460 mm |
Images
Sizes
| 8. Rear platform swing radius | 1290 mm | 8. Rear platform swing radius | 1000 mm |
| 2. Width to outside of caterpillar track | 2320 mm | 2. Width to outside of caterpillar track | 2000 mm |
| 4. Caterpillar track length on ground level | 2240 mm | 4. Caterpillar track length on ground level | 2000 mm |
| 5. Clearance | 360 mm | 5. Clearance | 335 mm |
Carrier
| 14. Shoe dimensions | 450 mm | 14. Shoe dimensions | 400 mm |
Booms/sections features 1
| 1. Unit load-transfer length | 5830 mm | 1. Unit load-transfer length | 5520 mm |
| 3. Unit load-transfer height | 2740 mm | 3. Unit load-transfer height | 2510 mm |
| 10. Maximum loading height | 5330 mm | 10. Maximum loading height | 4330 mm |
| 13. Maximum excavation depth | 4160 mm | 13. Maximum excavation depth | 3860 mm |