vs.

      Kubota KX080-3 vs. Sumitomo SH75X-3B

      5 reasons to buy Kubota KX080-3:

      Sizes

      Clearance 390 mm and 360 mm 8 % more or 30 mm

      Motor

      Full power 47.8 kW and 40 kW 16 % more or 7.8 kW
      Displacement 3.8 l. and 2.2 l. 42 % more or 1.6 l.

      Booms/sections features 1

      Maximum excavation depth 4600 mm and 4140 mm 10 % more or 460 mm
      Maximum vertical wall digging depth 3850 mm and 3640 mm 5 % more or 210 mm

      3 reasons to buy Sumitomo SH75X-3B:

      Sizes

      Width to outside of caterpillar track 2320 mm and 2200 mm 5 % more or 120 mm

      Operation

      Hydraulic system overflow valve pressure 29399.2 kPa and 28000 kPa 5 % more or 1399.2 kPa

      Carrier

      Maximum travel speed 5.3 km/h and 5.1 km/h 4 % more or 0.2 km/h

      Neutral reasons:

      Sizes

      Rear platform swing radius 1460 mm and 1425 mm
      Caterpillar track length on ground level 2900 mm and 2210 mm

      Operation

      Working weight 8330 kg and 7920 kg

      Motor

      Manufacturer Kubota and Isuzu
      Model V3800-DI and AU-4LE2X
      Power measured at 2000 rev / min and 2000 rev / min

      Carrier

      Shoe dimensions 450 mm and 450 mm

      Booms/sections features 1

      Maximum loading height 5250 mm and 5250 mm
      Unit load-transfer height 2540 mm and 2900 mm
      Unit load-transfer length 6450 mm and 5915 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 2200 mm 2. Width to outside of caterpillar track 2320 mm
      4. Caterpillar track length on ground level 2900 mm 4. Caterpillar track length on ground level 2210 mm
      5. Clearance 390 mm 5. Clearance 360 mm
      8. Rear platform swing radius 1460 mm 8. Rear platform swing radius 1425 mm

      Carrier

      14. Shoe dimensions 450 mm 14. Shoe dimensions 450 mm

      Booms/sections features 1

      3. Unit load-transfer height 2540 mm 3. Unit load-transfer height 2950 mm
      10. Maximum loading height 5250 mm 10. Maximum loading height 5540 mm
      12. Maximum vertical wall digging depth 3850 mm 12. Maximum vertical wall digging depth 4100 mm
      13. Maximum excavation depth 4600 mm 13. Maximum excavation depth 4540 mm
      1. Unit load-transfer length 6450 mm 1. Unit load-transfer length 5915 mm