- Home/
- Comparison/
- Medium-Sized Excavator/
- Kubota KX161-3 vs. Hyundai R75-7
Kubota KX161-3 vs. Hyundai R75-7
2 reasons to buy Kubota KX161-3:
Operation
| Hydraulic pump flow rate | 118.9 l/min and 203.1 l/min | 41 % less or 84.2 l/min |
Carrier
| Specific ground pressure | 29.4 kPa and 34 kPa | 14 % less or 4.6 kPa |
12 reasons to buy Hyundai R75-7:
Swing device
| Rotation speed | 9.7 rev / min and 9.3 rev / min | 4 % more or 0.4 rev |
Sizes
| Width to outside of caterpillar track | 2150 mm and 1955.8 mm | 9 % more or 194.2 mm |
Operation
| Fuel Capacity | 130 l. and 70 l. | 46 % more or 60 l. |
| Hydraulic system fluid volume | 85 l. and 67 l. | 21 % more or 18 l. |
Motor
| Power measured at | 2300 rev / min and 2200 rev / min | 4 % more or 100 rev |
| Effective power | 41.4 kW and 35 kW | 15 % more or 6.4 kW |
| Displacement | 3.3 l. and 2.4 l. | 27 % more or 0.9 l. |
Carrier
| Maximum travel speed | 4.8 km/h and 4.7 km/h | 2 % more or 0.1 km/h |
Booms/sections features 1
| Maximum excavation depth | 3980 mm and 3835.4 mm | 4 % more or 144.6 mm |
| Maximum radius along ground level | 6660 mm and 6121.4 mm | 8 % more or 538.6 mm |
| Maximum loading height | 4535 mm and 4165.6 mm | 8 % more or 369.4 mm |
| Maximum vertical wall digging depth | 3215 mm and 2590.8 mm | 19 % more or 624.2 mm |
Neutral reasons:
Operation
| Working weight | 5230.8 kg and 7429.8 kg |
Motor
| Model | V2403-M and S4S |
| Manufacturer | Kubota and Mitsubishi |
Booms/sections features 1
| Unit load-transfer height | 2540 mm and 2555 mm |
| Unit load-transfer length | 5539.7 mm and 6255 mm |
| Maximum cut height | 5715 mm and 6510 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 1955.8 mm | 2. Width to outside of caterpillar track | 2150 mm |
Booms/sections features 1
| 9. Maximum cut height | 5715 mm | 9. Maximum cut height | 6510 mm |
| 10. Maximum loading height | 4165.6 mm | 10. Maximum loading height | 4535 mm |
| 11. Maximum radius along ground level | 6121.4 mm | 11. Maximum radius along ground level | 6660 mm |
| 12. Maximum vertical wall digging depth | 2590.8 mm | 12. Maximum vertical wall digging depth | 3215 mm |
| 13. Maximum excavation depth | 3835.4 mm | 13. Maximum excavation depth | 3980 mm |
| 1. Unit load-transfer length | 5539.7 mm | 1. Unit load-transfer length | 6255 mm |
| 3. Unit load-transfer height | 2540 mm | 3. Unit load-transfer height | 2555 mm |