- Home/
- Comparison/
- Medium-Sized Excavator/
- Nagano NS55 vs. Doosan DX55
Nagano NS55 vs. Doosan DX55
3 reasons to buy Nagano NS55:
Operation
| Hydraulic pump flow rate | 60 l/min and 110 l/min | 45 % less or 50 l/min |
Motor
| Power measured at | 2400 rev / min and 2000 rev / min | 17 % more or 400 rev |
Carrier
| Maximum travel speed | 4.2 km/h and 4 km/h | 5 % more or 0.2 km/h |
5 reasons to buy Doosan DX55:
Sizes
| Width to outside of caterpillar track | 1880 mm and 1850 mm | 2 % more or 30 mm |
Motor
| Displacement | 3.3 l. and 2.4 l. | 27 % more or 0.9 l. |
Booms/sections features 1
| Maximum excavation depth | 3785 mm and 3750 mm | 1 % more or 35 mm |
| Maximum loading height | 4080 mm and 3830 mm | 6 % more or 250 mm |
| Maximum vertical wall digging depth | 3110 mm and 2910 mm | 6 % more or 200 mm |
Neutral reasons:
Sizes
| Rear platform swing radius | 1550 mm and 1650 mm |
| Caterpillar track length on ground level | 1910 mm and 1990 mm |
Operation
| Working weight | 5350 kg and 5600 kg |
Motor
| Cylinders number | 4 and 4 |
Carrier
| Shoe dimensions | 400 mm and 400 mm |
Booms/sections features 1
| Unit load-transfer height | 2530 mm and 1985 mm |
| Unit load-transfer length | 5795 mm and 5900 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 1850 mm | 2. Width to outside of caterpillar track | 1880 mm |
| 4. Caterpillar track length on ground level | 1910 mm | 4. Caterpillar track length on ground level | 1990 mm |
| 8. Rear platform swing radius | 1550 mm | 8. Rear platform swing radius | 1650 mm |
Carrier
| 14. Shoe dimensions | 400 mm | 14. Shoe dimensions | 400 mm |
Booms/sections features 1
| 1. Unit load-transfer length | 5795 mm | 1. Unit load-transfer length | 5970 mm |
| 3. Unit load-transfer height | 2530 mm | 3. Unit load-transfer height | 2175 mm |
| 10. Maximum loading height | 3830 mm | 10. Maximum loading height | 4280 mm |
| 12. Maximum vertical wall digging depth | 2910 mm | 12. Maximum vertical wall digging depth | 3400 mm |
| 13. Maximum excavation depth | 3750 mm | 13. Maximum excavation depth | 4085 mm |