- Home/
- Comparison/
- Medium-Sized Excavator/
- Pel-Job EB706 vs. Kubota U45
Pel-Job EB706 vs. Kubota U45
10 reasons to buy Pel-Job EB706:
Swing device
| Rotation speed | 11 rev / min and 9.1 rev / min | 17 % more or 1.9 rev |
Sizes
| Clearance | 360 mm and 320 mm | 11 % more or 40 mm |
| Width to outside of caterpillar track | 2300 mm and 1958.3 mm | 15 % more or 341.7 mm |
Operation
| Fuel Capacity | 110 l. and 70 l. | 36 % more or 40 l. |
| Hydraulic system fluid volume | 131 l. and 43.9 l. | 66 % more or 87.1 l. |
Motor
| Displacement | 3.3 l. and 2.2 l. | 33 % more or 1.1 l. |
Carrier
| Maximum travel speed | 5.1 km/h and 4.3 km/h | 16 % more or 0.8 km/h |
Booms/sections features 1
| Maximum loading height | 4521 mm and 3970 mm | 12 % more or 551 mm |
| Maximum excavation depth | 4012 mm and 3600 mm | 10 % more or 412 mm |
| Maximum radius along ground level | 6498 mm and 5875 mm | 10 % more or 623 mm |
4 reasons to buy Kubota U45:
Operation
| Hydraulic pump flow rate | 121.5 l/min and 160 l/min | 24 % less or 38.5 l/min |
Motor
| Power measured at | 2250 rev / min and 2200 rev / min | 2 % more or 50 rev |
Carrier
| Specific ground pressure | 30.1 kPa and 39.2 kPa | 23 % less or 9.1 kPa |
Booms/sections features 1
| Maximum vertical wall digging depth | 2400 mm and 2370 mm | 1 % more or 30 mm |
Neutral reasons:
Operation
| Working weight | 7450 kg and 5375.1 kg |
Motor
| Manufacturer | Mitsubishi and Kubota |
| Model | S4S and V2203-M |
| Cylinders number | 4 and 4 |
Booms/sections features 1
| Unit load-transfer height | 2552 mm and 2540 mm |
| Unit load-transfer length | 6473 mm and 5539.7 mm |
| Maximum cut height | 6273 mm and 5520 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 2300 mm | 2. Width to outside of caterpillar track | 1958.3 mm |
| 5. Clearance | 360 mm | 5. Clearance | 320 mm |
Booms/sections features 1
| 10. Maximum loading height | 4789 mm | 10. Maximum loading height | 3970 mm |
| 11. Maximum radius along ground level | 6888 mm | 11. Maximum radius along ground level | 5875 mm |
| 12. Maximum vertical wall digging depth | 2713 mm | 12. Maximum vertical wall digging depth | 2400 mm |
| 13. Maximum excavation depth | 4412 mm | 13. Maximum excavation depth | 3600 mm |
| 1. Unit load-transfer length | 6473 mm | 1. Unit load-transfer length | 5539.7 mm |
| 3. Unit load-transfer height | 2552 mm | 3. Unit load-transfer height | 2540 mm |
| 9. Maximum cut height | 6273 mm | 9. Maximum cut height | 5520 mm |