- Home/
- Comparison/
- Medium-Sized Excavator/
- Terex TC60 vs. Sumitomo SH80-3B
Terex TC60 vs. Sumitomo SH80-3B
3 reasons to buy Terex TC60:
Motor
Power measured at | 2400 rev / min and 2000 rev / min | 17 % more or 400 rev |
Displacement | 2.5 l. and 2.2 l. | 12 % more or 0.3 l. |
Carrier
Maximum travel speed | 5.2 km/h and 5.1 km/h | 2 % more or 0.1 km/h |
6 reasons to buy Sumitomo SH80-3B:
Sizes
Width to outside of caterpillar track | 2320 mm and 2000 mm | 14 % more or 320 mm |
Operation
Hydraulic system overflow valve pressure | 33000 kPa and 24497.1 kPa | 26 % more or 8502.9 kPa |
Hydraulic pump flow rate | 136 l/min and 176.4 l/min | 23 % less or 40.4 l/min |
Booms/sections features 1
Maximum vertical wall digging depth | 3350 mm and 1900 mm | 43 % more or 1450 mm |
Maximum excavation depth | 4590 mm and 3700 mm | 19 % more or 890 mm |
Maximum loading height | 4600 mm and 3600 mm | 22 % more or 1000 mm |
Neutral reasons:
Sizes
Clearance | 360 mm and 360 mm |
Operation
Working weight | 5960.2 kg and 8500 kg |
Motor
Cylinders number | 4 and 4 |
Manufacturer | Mitsubishi and Isuzu |
Carrier
Shoe dimensions | 400 mm and 450 mm |
Images
Sizes
2. Width to outside of caterpillar track | 2000 mm | 2. Width to outside of caterpillar track | 2320 mm |
5. Clearance | 360 mm | 5. Clearance | 360 mm |
Carrier
14. Shoe dimensions | 400 mm | 14. Shoe dimensions | 450 mm |
Booms/sections features 1
10. Maximum loading height | 3700 mm | 10. Maximum loading height | 4600 mm |
12. Maximum vertical wall digging depth | 2100 mm | 12. Maximum vertical wall digging depth | 3350 mm |
13. Maximum excavation depth | 3900 mm | 13. Maximum excavation depth | 4590 mm |
1. Unit load-transfer length | 5817 mm | 1. Unit load-transfer length | 6740 mm |
3. Unit load-transfer height | 2616 mm | 3. Unit load-transfer height | 2700 mm |