vs.

      Volvo ECR58 vs. Kubota U45

      10 reasons to buy Volvo ECR58:

      Swing device

      Rotation speed 10 rev / min and 9.1 rev / min 9 % more or 0.9 rev

      Sizes

      Width to outside of caterpillar track 2000 mm and 1958.3 mm 2 % more or 41.7 mm
      Clearance 370 mm and 320 mm 14 % more or 50 mm

      Operation

      Engine oil volume 11.5 l. and 8.7 l. 24 % more or 2.8 l.
      Hydraulic system fluid volume 90 l. and 43.9 l. 51 % more or 46.1 l.

      Motor

      Effective power 37.9 kW and 31.3 kW 17 % more or 6.6 kW
      Displacement 3.1 l. and 2.2 l. 29 % more or 0.9 l.

      Carrier

      Specific ground pressure 29.4 kPa and 30.1 kPa 2 % less or 0.7 kPa

      Booms/sections features 1

      Maximum radius along ground level 5940 mm and 5875 mm 1 % more or 65 mm
      Maximum vertical wall digging depth 2910 mm and 2400 mm 18 % more or 510 mm

      4 reasons to buy Kubota U45:

      Operation

      Hydraulic pump flow rate 121.5 l/min and 129.8 l/min 6 % less or 8.3 l/min
      Fuel Capacity 70 l. and 65 l. 7 % more or 5 l.
      Cooling system fluid volume 8.7 l. and 6.5 l. 25 % more or 2.2 l.

      Motor

      Power measured at 2250 rev / min and 2100 rev / min 7 % more or 150 rev

      Neutral reasons:

      Operation

      Working weight 5468.5 kg and 5375.1 kg

      Motor

      Model D3.1 and V2203-M
      Manufacturer Volvo and Kubota
      Cylinders number 4 and 4
      Aspiration natural aspiration and diesel engine with liquid cooling and overhead valves in the cylinder head

      Carrier

      Maximum travel speed 4.3 km/h and 4.3 km/h

      Booms/sections features 1

      Unit load-transfer height 2580 mm and 2540 mm
      Unit load-transfer length 5600 mm and 5539.7 mm
      Maximum excavation depth 3600 mm and 3600 mm
      Maximum cut height 5610 mm and 5520 mm
      Maximum loading height 3970 mm and 3970 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 2000 mm 2. Width to outside of caterpillar track 1958.3 mm
      5. Clearance 370 mm 5. Clearance 320 mm

      Booms/sections features 1

      13. Maximum excavation depth 3600 mm 13. Maximum excavation depth 3600 mm
      1. Unit load-transfer length 5600 mm 1. Unit load-transfer length 5539.7 mm
      3. Unit load-transfer height 2580 mm 3. Unit load-transfer height 2540 mm
      9. Maximum cut height 5850 mm 9. Maximum cut height 5520 mm
      10. Maximum loading height 4210 mm 10. Maximum loading height 3970 mm
      11. Maximum radius along ground level 6320 mm 11. Maximum radius along ground level 5875 mm
      12. Maximum vertical wall digging depth 3260 mm 12. Maximum vertical wall digging depth 2400 mm