vs.

      Yanmar Vio55-5 vs. Kobelco SK70SR-2

      1 reasons to buy Yanmar Vio55-5:

      Motor

      Power measured at 2400 rev / min and 2200 rev / min 8 % more or 200 rev

      9 reasons to buy Kobelco SK70SR-2:

      Sizes

      Width to outside of caterpillar track 2320 mm and 1990 mm 14 % more or 330 mm

      Operation

      Hydraulic system overflow valve pressure 29400 kPa and 24497.1 kPa 17 % more or 4902.9 kPa
      Hydraulic pump flow rate 132 l/min and 132.5 l/min 0 % less or 0.5 l/min

      Motor

      Full power 41 kW and 28.9 kW 30 % more or 12.1 kW

      Carrier

      Maximum travel speed 5.3 km/h and 4.3 km/h 19 % more or 1.0 km/h

      Booms/sections features 1

      Maximum loading height 5330 mm and 4400 mm 17 % more or 930 mm
      Maximum vertical wall digging depth 3450 mm and 2900 mm 16 % more or 550 mm
      Maximum excavation depth 4160 mm and 3980 mm 4 % more or 180 mm
      Maximum radius along ground level 6300 mm and 6200 mm 2 % more or 100 mm

      Neutral reasons:

      Sizes

      Clearance 360 mm and 360 mm
      Rear platform swing radius 995 mm and 1290 mm

      Operation

      Working weight 5250.8 kg and 7470 kg

      Motor

      Model 4TNV88-PBV and AU-4LE2X
      Manufacturer Yanmar and Isuzu

      Carrier

      Shoe dimensions 400 mm and 450 mm

      Booms/sections features 1

      Unit load-transfer height 2620 mm and 2740 mm
      Unit load-transfer length 5560 mm and 5830 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 1990 mm 2. Width to outside of caterpillar track 2320 mm
      5. Clearance 360 mm 5. Clearance 360 mm
      8. Rear platform swing radius 995 mm 8. Rear platform swing radius 1290 mm

      Carrier

      14. Shoe dimensions 400 mm 14. Shoe dimensions 450 mm

      Booms/sections features 1

      10. Maximum loading height 4400 mm 10. Maximum loading height 5330 mm
      11. Maximum radius along ground level 6200 mm 11. Maximum radius along ground level 6300 mm
      12. Maximum vertical wall digging depth 2900 mm 12. Maximum vertical wall digging depth 3450 mm
      13. Maximum excavation depth 3980 mm 13. Maximum excavation depth 4160 mm
      1. Unit load-transfer length 5560 mm 1. Unit load-transfer length 5830 mm
      3. Unit load-transfer height 2620 mm 3. Unit load-transfer height 2740 mm