- Home/
- Comparison/
- Mini Digger/
- Case CX18B serie 2 vs. Case CX31B ZTS
Case CX18B serie 2 vs. Case CX31B ZTS
3 reasons to buy Case CX18B serie 2:
Operation
| Generator current strength | 40 amperes and 24 amperes | 40 % more or 16 amperes |
| Hydraulic pump flow rate | 15.5 l/min and 97 l/min | 84 % less or 81.5 l/min |
Motor
| Torque measured at | 1800 rev / min and 1440 rev / min | 20 % more or 360 rev |
21 reasons to buy Case CX31B ZTS:
Sizes
| Width to outside of caterpillar track | 1550 mm and 1330 mm | 14 % more or 220 mm |
| Counterweight ground clearance | 570 mm and 440 mm | 23 % more or 130 mm |
Operation
| Engine oil volume | 6.7 l. and 3 l. | 55 % more or 3.7 l. |
| Fuel Capacity | 38 l. and 19.5 l. | 49 % more or 18.5 l. |
| Cooling system fluid volume | 4.6 l. and 3.5 l. | 24 % more or 1.1 l. |
| Hydraulic system fluid volume | 48 l. and 12.3 l. | 74 % more or 35.7 l. |
| Hydraulic system overflow valve pressure | 23000 kPa and 21600 kPa | 6 % more or 1400 kPa |
Motor
| Power measured at | 2400 rev / min and 2100 rev / min | 12 % more or 300 rev |
| Maximum torque | 98.4 Nm and 53.5 Nm | 46 % more or 44.9 Nm |
| Cylinders number | 4 and 3 | 25 % more or 1 |
Carrier
| Rolling bearings number on either side | 4 and 3 | 25 % more or 1 |
| Specific ground pressure | 30 kPa and 31 kPa | 3 % less or 1 kPa |
| Maximum travel speed | 4.5 km/h and 3.5 km/h | 22 % more or 1.0 km/h |
Booms/sections features 2
| Maximum loading height | 3550 mm and 2600 mm | 27 % more or 950 mm |
| Maximum vertical wall digging depth | 2430 mm and 2260 mm | 7 % more or 170 mm |
| Maximum excavation depth | 3100 mm and 2400 mm | 23 % more or 700 mm |
| Maximum radius along ground level | 5200 mm and 3900 mm | 25 % more or 1300 mm |
Booms/sections features 1
| Maximum loading height | 3360 mm and 2470 mm | 26 % more or 890 mm |
| Maximum vertical wall digging depth | 2160 mm and 2060 mm | 5 % more or 100 mm |
| Maximum excavation depth | 2810 mm and 2200 mm | 22 % more or 610 mm |
| Maximum radius along ground level | 4930 mm and 3705 mm | 25 % more or 1225 mm |
Neutral reasons:
Sizes
| Height to cab upper part | 2350 mm and 2570 mm |
| Rear platform swing radius | 1060 mm and 775 mm |
| Caterpillar track length on ground level | 1210 mm and 1540 mm |
Operation
| Working weight | 1780 kg and 3030 kg |
| Operating voltage | 12 V and 12 V |
Motor
| Manufacturer | Mitsubishi and Yanmar |
| Model | L3E and 3TNV88-BPYB |
Carrier
| Track width | 1100 mm and 1250 mm |
| Shoe dimensions | 230 mm and 300 mm |
Booms/sections features 2
| Unit load-transfer height | 2350 mm and 2570 mm |
| Unit load-transfer length | 3620 mm and 4390 mm |
| Maximum cut height | 3680 mm and 4960 mm |
Booms/sections features 1
| Unit load-transfer height | 2350 mm and 2570 mm |
| Unit load-transfer length | 3600 mm and 4390 mm |
| Maximum cut height | 3550 mm and 4770 mm |
Images
Sizes
| 2. Width to outside of caterpillar track | 1330 mm | 2. Width to outside of caterpillar track | 1550 mm |
| 4. Caterpillar track length on ground level | 1210 mm | 4. Caterpillar track length on ground level | 1540 mm |
| 7. Height to cab upper part | 2350 mm | 7. Height to cab upper part | 2570 mm |
| 8. Rear platform swing radius | 1060 mm | 8. Rear platform swing radius | 775 mm |
| 15. Counterweight ground clearance | 440 mm | 15. Counterweight ground clearance | 570 mm |
Carrier
| 6. Track width | 1100 mm | 6. Track width | 1250 mm |
| 14. Shoe dimensions | 230 mm | 14. Shoe dimensions | 300 mm |
Booms/sections features 1
| 1. Unit load-transfer length | 3620 mm | 1. Unit load-transfer length | 4390 mm |
| 3. Unit load-transfer height | 2350 mm | 3. Unit load-transfer height | 2570 mm |
| 9. Maximum cut height | 3680 mm | 9. Maximum cut height | 4960 mm |
| 10. Maximum loading height | 2600 mm | 10. Maximum loading height | 3550 mm |
| 11. Maximum radius along ground level | 3900 mm | 11. Maximum radius along ground level | 5200 mm |
| 12. Maximum vertical wall digging depth | 2260 mm | 12. Maximum vertical wall digging depth | 2430 mm |
| 13. Maximum excavation depth | 2400 mm | 13. Maximum excavation depth | 3100 mm |