- Home/
- Comparison/
- Mini Digger/
- Case CX22B vs. Pel-Job EB450XT
Case CX22B vs. Pel-Job EB450XT
3 reasons to buy Case CX22B:
Sizes
| Clearance | 480 mm and 320 mm | 33 % more or 160 mm |
Operation
| Hydraulic pump flow rate | 26 l/min and 99 l/min | 74 % less or 73 l/min |
Motor
| Displacement | 21.8 l. and 2.3 l. | 89 % more or 19.5 l. |
11 reasons to buy Pel-Job EB450XT:
Swing device
| Rotation speed | 10 rev / min and 8.7 rev / min | 13 % more or 1.3 rev |
Sizes
| Width to outside of caterpillar track | 1800 mm and 1400 mm | 22 % more or 400 mm |
Operation
| Hydraulic system fluid volume | 62 l. and 25 l. | 60 % more or 37 l. |
| Engine oil volume | 7.7 l. and 5.5 l. | 29 % more or 2.2 l. |
| Fuel Capacity | 66 l. and 28 l. | 58 % more or 38 l. |
| Cooling system fluid volume | 8 l. and 3.8 l. | 52 % more or 4.2 l. |
Motor
| Maximum torque | 137 Nm and 80.1 Nm | 42 % more or 56.9 Nm |
| Effective power | 27.6 kW and 17.2 kW | 38 % more or 10.4 kW |
Booms/sections features 1
| Maximum excavation depth | 3320 mm and 2300 mm | 31 % more or 1020 mm |
| Maximum radius along ground level | 5280 mm and 4060 mm | 23 % more or 1220 mm |
| Maximum vertical wall digging depth | 2310 mm and 1790 mm | 23 % more or 520 mm |
Neutral reasons:
Sizes
| Height to cab upper part | 2460 mm and 2510 mm |
| Rear platform swing radius | 740 mm and 1360 mm |
| Caterpillar track length on ground level | 1490 mm and 1770 mm |
Motor
| Model | 3TNV82A-SYB and K4N |
Images
Sizes
| 2. Width to outside of caterpillar track | 1400 mm | 2. Width to outside of caterpillar track | 1800 mm |
| 4. Caterpillar track length on ground level | 1490 mm | 4. Caterpillar track length on ground level | 1770 mm |
| 5. Clearance | 480 mm | 5. Clearance | 320 mm |
| 7. Height to cab upper part | 2460 mm | 7. Height to cab upper part | 2510 mm |
| 8. Rear platform swing radius | 740 mm | 8. Rear platform swing radius | 1360 mm |
Booms/sections features 1
| 11. Maximum radius along ground level | 4060 mm | 11. Maximum radius along ground level | 5280 mm |
| 12. Maximum vertical wall digging depth | 1790 mm | 12. Maximum vertical wall digging depth | 2310 mm |
| 13. Maximum excavation depth | 2300 mm | 13. Maximum excavation depth | 3320 mm |