vs.

      Case CX22B vs. Pel-Job EB450XT

      3 reasons to buy Case CX22B:

      Sizes

      Clearance 480 mm and 320 mm 33 % more or 160 mm

      Operation

      Hydraulic pump flow rate 26 l/min and 99 l/min 74 % less or 73 l/min

      Motor

      Displacement 21.8 l. and 2.3 l. 89 % more or 19.5 l.

      11 reasons to buy Pel-Job EB450XT:

      Swing device

      Rotation speed 10 rev / min and 8.7 rev / min 13 % more or 1.3 rev

      Sizes

      Width to outside of caterpillar track 1800 mm and 1400 mm 22 % more or 400 mm

      Operation

      Hydraulic system fluid volume 62 l. and 25 l. 60 % more or 37 l.
      Engine oil volume 7.7 l. and 5.5 l. 29 % more or 2.2 l.
      Fuel Capacity 66 l. and 28 l. 58 % more or 38 l.
      Cooling system fluid volume 8 l. and 3.8 l. 52 % more or 4.2 l.

      Motor

      Maximum torque 137 Nm and 80.1 Nm 42 % more or 56.9 Nm
      Effective power 27.6 kW and 17.2 kW 38 % more or 10.4 kW

      Booms/sections features 1

      Maximum excavation depth 3320 mm and 2300 mm 31 % more or 1020 mm
      Maximum radius along ground level 5280 mm and 4060 mm 23 % more or 1220 mm
      Maximum vertical wall digging depth 2310 mm and 1790 mm 23 % more or 520 mm

      Neutral reasons:

      Sizes

      Height to cab upper part 2460 mm and 2510 mm
      Rear platform swing radius 740 mm and 1360 mm
      Caterpillar track length on ground level 1490 mm and 1770 mm

      Motor

      Model 3TNV82A-SYB and K4N

      Images

      Sizes

      2. Width to outside of caterpillar track 1400 mm 2. Width to outside of caterpillar track 1800 mm
      4. Caterpillar track length on ground level 1490 mm 4. Caterpillar track length on ground level 1770 mm
      5. Clearance 480 mm 5. Clearance 320 mm
      7. Height to cab upper part 2460 mm 7. Height to cab upper part 2510 mm
      8. Rear platform swing radius 740 mm 8. Rear platform swing radius 1360 mm

      Booms/sections features 1

      11. Maximum radius along ground level 4060 mm 11. Maximum radius along ground level 5280 mm
      12. Maximum vertical wall digging depth 1790 mm 12. Maximum vertical wall digging depth 2310 mm
      13. Maximum excavation depth 2300 mm 13. Maximum excavation depth 3320 mm