- Home/
- Comparison/
- Mini Digger/
- Case CX22B vs. Takeuchi TB135
Case CX22B vs. Takeuchi TB135
4 reasons to buy Case CX22B:
Sizes
| Clearance | 480 mm and 294.7 mm | 39 % more or 185.3 mm |
Operation
| Engine oil volume | 5.5 l. and 4.8 l. | 13 % more or 0.7 l. |
| Hydraulic pump flow rate | 26 l/min and 75 l/min | 65 % less or 49 l/min |
Motor
| Displacement | 21.8 l. and 1.6 l. | 93 % more or 20.2 l. |
9 reasons to buy Takeuchi TB135:
Swing device
| Rotation speed | 9.2 rev / min and 8.7 rev / min | 5 % more or 0.5 rev |
Sizes
| Width to outside of caterpillar track | 1624.6 mm and 1400 mm | 14 % more or 224.6 mm |
Operation
| Fuel Capacity | 51.1 l. and 28 l. | 45 % more or 23.1 l. |
| Cooling system fluid volume | 5.4 l. and 3.8 l. | 30 % more or 1.6 l. |
| Hydraulic system fluid volume | 85.2 l. and 25 l. | 71 % more or 60.2 l. |
Motor
| Maximum torque | 107.1 Nm and 80.1 Nm | 25 % more or 27.0 Nm |
Booms/sections features 1
| Maximum excavation depth | 3404.6 mm and 2300 mm | 32 % more or 1104.6 mm |
| Maximum radius along ground level | 5334 mm and 4060 mm | 24 % more or 1274 mm |
| Maximum vertical wall digging depth | 2615.2 mm and 1790 mm | 32 % more or 825.2 mm |
Neutral reasons:
Sizes
| Height to cab upper part | 2460 mm and 2438.4 mm |
| Rear platform swing radius | 740 mm and 1396 mm |
| Caterpillar track length on ground level | 1490 mm and 1652 mm |
Motor
| Model | 3TNV82A-SYB and 3TNV88-QTB |
| Manufacturer | Yanmar and Yanmar |
Images
Sizes
| 2. Width to outside of caterpillar track | 1400 mm | 2. Width to outside of caterpillar track | 1624.6 mm |
| 4. Caterpillar track length on ground level | 1490 mm | 4. Caterpillar track length on ground level | 1652 mm |
| 5. Clearance | 480 mm | 5. Clearance | 294.7 mm |
| 7. Height to cab upper part | 2460 mm | 7. Height to cab upper part | 2438.4 mm |
| 8. Rear platform swing radius | 740 mm | 8. Rear platform swing radius | 1396 mm |
Booms/sections features 1
| 11. Maximum radius along ground level | 4060 mm | 11. Maximum radius along ground level | 5334 mm |
| 12. Maximum vertical wall digging depth | 1790 mm | 12. Maximum vertical wall digging depth | 2615.2 mm |
| 13. Maximum excavation depth | 2300 mm | 13. Maximum excavation depth | 3404.6 mm |