- Home/
- Comparison/
- Mini Digger/
- Hitachi ZX8-2 vs. Daewoo S015P
Hitachi ZX8-2 vs. Daewoo S015P
1 reasons to buy Hitachi ZX8-2:
Carrier
| Maximum travel speed | 4 km/h and 2.2 km/h | 45 % more or 1.8 km/h |
8 reasons to buy Daewoo S015P:
Swing device
| Rotation speed | 11 rev / min and 8.5 rev / min | 23 % more or 2.5 rev |
Sizes
| Width to outside of caterpillar track | 1000 mm and 910 mm | 9 % more or 90 mm |
Operation
| Fuel Capacity | 19 l. and 16 l. | 16 % more or 3 l. |
| Hydraulic system fluid volume | 26 l. and 18 l. | 31 % more or 8 l. |
Motor
| Effective power | 12.5 kW and 9.5 kW | 24 % more or 3.0 kW |
| Power measured at | 2300 rev / min and 2100 rev / min | 9 % more or 200 rev |
Booms/sections features 1
| Maximum excavation depth | 2140 mm and 1600 mm | 25 % more or 540 mm |
| Maximum loading height | 2245 mm and 2050 mm | 9 % more or 195 mm |
Neutral reasons:
Sizes
| Height to cab upper part | 2150 mm and 2247 mm |
| Rear platform swing radius | 1090 mm and 1190 mm |
| Caterpillar track length on ground level | 900 mm and 1224 mm |
Operation
| Working weight | 1100 kg and 1570 kg |
Motor
| Model | 3TNV70 and L3E |
Carrier
| Shoe dimensions | 180 mm and 230 mm |
Booms/sections features 1
| Maximum cut height | 2840 mm and 3400 mm |
| Unit load-transfer length | 2970 mm and 3755 mm |
Images
Sizes
| 4. Caterpillar track length on ground level | 900 mm | 4. Caterpillar track length on ground level | 1224 mm |
| 7. Height to cab upper part | 2150 mm | 7. Height to cab upper part | 2247 mm |
| 8. Rear platform swing radius | 1090 mm | 8. Rear platform swing radius | 1190 mm |
| 2. Width to outside of caterpillar track | 910 mm | 2. Width to outside of caterpillar track | 1000 mm |
Carrier
| 14. Shoe dimensions | 180 mm | 14. Shoe dimensions | 230 mm |
Booms/sections features 1
| 1. Unit load-transfer length | 3030 mm | 1. Unit load-transfer length | 3755 mm |
| 9. Maximum cut height | 2940 mm | 9. Maximum cut height | 3400 mm |
| 10. Maximum loading height | 2150 mm | 10. Maximum loading height | 2245 mm |
| 13. Maximum excavation depth | 1800 mm | 13. Maximum excavation depth | 2140 mm |