- Home/
- Comparison/
- Mini Digger/
- Hitachi ZX8-2 vs. Komatsu PC35MR-2
Hitachi ZX8-2 vs. Komatsu PC35MR-2
1 reasons to buy Hitachi ZX8-2:
Motor
| Power measured at | 2100 rev / min and 1.6 rev / min | 100 % more or 2098.4 rev |
10 reasons to buy Komatsu PC35MR-2:
Swing device
| Rotation speed | 9 rev / min and 8.5 rev / min | 6 % more or 0.5 rev |
Sizes
| Width to outside of caterpillar track | 1740 mm and 910 mm | 48 % more or 830 mm |
| Clearance | 2105 mm and 130 mm | 94 % more or 1975 mm |
Operation
| Fuel Capacity | 44 l. and 16 l. | 64 % more or 28 l. |
| Hydraulic system fluid volume | 33 l. and 18 l. | 45 % more or 15 l. |
| Engine oil volume | 7.7 l. and 2.8 l. | 64 % more or 4.9 l. |
Carrier
| Rolling bearings number on either side | 4 and 2 | 50 % more or 2 |
| Maximum travel speed | 4.6 km/h and 4 km/h | 13 % more or 0.6 km/h |
Booms/sections features 1
| Maximum vertical wall digging depth | 2720 mm and 1450 mm | 47 % more or 1270 mm |
| Maximum excavation depth | 3170 mm and 1600 mm | 50 % more or 1570 mm |
Neutral reasons:
Sizes
| Height to cab upper part | 2150 mm and 2530 mm |
| Rear platform swing radius | 1090 mm and 950 mm |
| Caterpillar track length on ground level | 900 mm and 4850 mm |
Operation
| Working weight | 1100 kg and 3740 kg |
| Cooling system fluid volume | 3.3 l. and 3.3 l. |
| Operating voltage | 12 V and 12 V |
Motor
| Model | 3TNV70 and 3D88E-5 |
| Manufacturer | Yanmar and Komatsu |
Images
Sizes
| 2. Width to outside of caterpillar track | 910 mm | 2. Width to outside of caterpillar track | 1740 mm |
| 4. Caterpillar track length on ground level | 900 mm | 4. Caterpillar track length on ground level | 4850 mm |
| 5. Clearance | 130 mm | 5. Clearance | 2105 mm |
| 7. Height to cab upper part | 2150 mm | 7. Height to cab upper part | 2530 mm |
| 8. Rear platform swing radius | 1090 mm | 8. Rear platform swing radius | 950 mm |
Booms/sections features 1
| 12. Maximum vertical wall digging depth | 1600 mm | 12. Maximum vertical wall digging depth | 2720 mm |
| 13. Maximum excavation depth | 1800 mm | 13. Maximum excavation depth | 3170 mm |