- Home/
- Comparison/
- Mini Digger/
- Hyundai R22-7 vs. Gehl 153
Hyundai R22-7 vs. Gehl 153
7 reasons to buy Hyundai R22-7:
Swing device
Rotation speed | 11.5 rev / min and 10 rev / min | 13 % more or 1.5 rev |
Operation
Fuel Capacity | 29 l. and 24 l. | 17 % more or 5 l. |
Hydraulic system fluid volume | 33 l. and 21 l. | 36 % more or 12 l. |
Hydraulic pump flow rate | 63.4 l/min and 70.8 l/min | 10 % less or 7.4 l/min |
Motor
Power measured at | 2400 rev / min and 2200 rev / min | 8 % more or 200 rev |
Booms/sections features 1
Maximum excavation depth | 2365 mm and 2185 mm | 8 % more or 180 mm |
Maximum vertical wall digging depth | 1795 mm and 1490 mm | 17 % more or 305 mm |
5 reasons to buy Gehl 153:
Operation
Hydraulic system overflow valve pressure | 19994.8 kPa and 18615.8 kPa | 7 % more or 1379.0 kPa |
Motor
Effective power | 17.7 kW and 12.7 kW | 28 % more or 5.0 kW |
Carrier
Maximum travel speed | 5.6 km/h and 3.8 km/h | 32 % more or 1.8 km/h |
Specific ground pressure | 26.2 kPa and 33.1 kPa | 21 % less or 6.9 kPa |
Booms/sections features 1
Maximum loading height | 2545 mm and 2510 mm | 1 % more or 35 mm |
Neutral reasons:
Sizes
Rear platform swing radius | 1745 mm and 1160 mm |
Caterpillar track length on ground level | 1325 mm and 1223 mm |
Operation
Working weight | 2199.9 kg and 1705.1 kg |
Motor
Manufacturer | Mitsubishi and Yanmar |
Model | L3E-W231 and 3TNE 74 |
Carrier
Shoe dimensions | 230 mm and 230 mm |
Booms/sections features 1
Maximum cut height | 3745 mm and 3500 mm |
Images
Sizes
4. Caterpillar track length on ground level | 1325 mm | 4. Caterpillar track length on ground level | 1223 mm |
8. Rear platform swing radius | 1745 mm | 8. Rear platform swing radius | 1160 mm |
Carrier
14. Shoe dimensions | 230 mm | 14. Shoe dimensions | 230 mm |
Booms/sections features 1
9. Maximum cut height | 3745 mm | 9. Maximum cut height | 4005 mm |
10. Maximum loading height | 2510 mm | 10. Maximum loading height | 2910 mm |
12. Maximum vertical wall digging depth | 1795 mm | 12. Maximum vertical wall digging depth | 1670 mm |
13. Maximum excavation depth | 2365 mm | 13. Maximum excavation depth | 2280 mm |