vs.

      Terex TC35 vs. Daewoo S010

      9 reasons to buy Terex TC35:

      Swing device

      Rotation speed 10.5 rev / min and 9.1 rev / min 13 % more or 1.4 rev

      Sizes

      Width to outside of caterpillar track 1500 mm and 810 mm 46 % more or 690 mm

      Operation

      Fuel Capacity 52 l. and 8 l. 85 % more or 44 l.
      Hydraulic system fluid volume 91 l. and 9 l. 90 % more or 82 l.
      Hydraulic system overflow valve pressure 24993.5 kPa and 14720.3 kPa 41 % more or 10273.2 kPa

      Motor

      Effective power 24.2 kW and 7 kW 71 % more or 17.2 kW

      Carrier

      Maximum travel speed 4.6 km/h and 1.9 km/h 59 % more or 2.7 km/h

      Booms/sections features 1

      Maximum loading height 3220 mm and 2010 mm 38 % more or 1210 mm
      Maximum excavation depth 3400 mm and 1550 mm 54 % more or 1850 mm

      2 reasons to buy Daewoo S010:

      Operation

      Hydraulic pump flow rate 20 l/min and 99 l/min 80 % less or 79 l/min

      Motor

      Power measured at 2550 rev / min and 2100 rev / min 18 % more or 450 rev

      Neutral reasons:

      Sizes

      Height to cab upper part 2500 mm and 1520 mm
      Rear platform swing radius 1300 mm and 800 mm

      Operation

      Working weight 3500 kg and 769.7 kg

      Motor

      Manufacturer Mitsubishi and Yanmar
      Model S 4L and 2 TNE 68-DB

      Carrier

      Shoe dimensions 300 mm and 180 mm

      Booms/sections features 1

      Maximum cut height 4730 mm and 2825 mm

      Images

      Sizes

      7. Height to cab upper part 2500 mm 7. Height to cab upper part 1520 mm
      8. Rear platform swing radius 1300 mm 8. Rear platform swing radius 800 mm
      2. Width to outside of caterpillar track 1500 mm 2. Width to outside of caterpillar track 810 mm

      Carrier

      14. Shoe dimensions 300 mm 14. Shoe dimensions 180 mm

      Booms/sections features 1

      9. Maximum cut height 4850 mm 9. Maximum cut height 2825 mm
      10. Maximum loading height 3340 mm 10. Maximum loading height 2010 mm
      13. Maximum excavation depth 3600 mm 13. Maximum excavation depth 1550 mm