- Home/
- Comparison/
- Mini Digger/
- Terex TC37 vs. Komatsu PC01-1
Terex TC37 vs. Komatsu PC01-1
9 reasons to buy Terex TC37:
Swing device
Rotation speed | 10 rev / min and 7 rev / min | 30 % more or 3 rev |
Sizes
Width to outside of caterpillar track | 1800 mm and 580 mm | 68 % more or 1220 mm |
Clearance | 300 mm and 100 mm | 67 % more or 200 mm |
Operation
Fuel Capacity | 65 l. and 4.5 l. | 93 % more or 60.5 l. |
Hydraulic system fluid volume | 70 l. and 4.8 l. | 93 % more or 65.2 l. |
Hydraulic system overflow valve pressure | 24993.5 kPa and 14685.8 kPa | 41 % more or 10307.7 kPa |
Carrier
Maximum travel speed | 4.6 km/h and 1.4 km/h | 70 % more or 3.2 km/h |
Booms/sections features 1
Maximum loading height | 3060 mm and 1300 mm | 58 % more or 1760 mm |
Maximum excavation depth | 3180 mm and 1050 mm | 67 % more or 2130 mm |
3 reasons to buy Komatsu PC01-1:
Operation
Hydraulic pump flow rate | 10 l/min and 95 l/min | 89 % less or 85 l/min |
Motor
Power measured at | 3000 rev / min and 2100 rev / min | 30 % more or 900 rev |
Carrier
Specific ground pressure | 16.5 kPa and 28.3 kPa | 42 % less or 11.8 kPa |
Neutral reasons:
Sizes
Rear platform swing radius | 900 mm and 650 mm |
Operation
Working weight | 3650.1 kg and 380 kg |
Motor
Manufacturer | Mitsubishi and Honda |
Model | S4L2 and GX160KI |
Carrier
Track width | 1500 mm and 450 mm |
Shoe dimensions | 300 mm and 130 mm |
Booms/sections features 1
Maximum cut height | 4530 mm and 1850 mm |
Images
Sizes
2. Width to outside of caterpillar track | 1800 mm | 2. Width to outside of caterpillar track | 580 mm |
5. Clearance | 300 mm | 5. Clearance | 100 mm |
8. Rear platform swing radius | 900 mm | 8. Rear platform swing radius | 650 mm |
Carrier
6. Track width | 1500 mm | 6. Track width | 450 mm |
14. Shoe dimensions | 300 mm | 14. Shoe dimensions | 130 mm |
Booms/sections features 1
9. Maximum cut height | 4640 mm | 9. Maximum cut height | 1850 mm |
10. Maximum loading height | 3190 mm | 10. Maximum loading height | 1300 mm |
13. Maximum excavation depth | 3380 mm | 13. Maximum excavation depth | 1050 mm |