vs.

      Vermeer CX218 vs. Kubota U15

      7 reasons to buy Vermeer CX218:

      Sizes

      Width to outside of caterpillar track 1300 mm and 1240 mm 5 % more or 60 mm
      Clearance 480 mm and 145 mm 70 % more or 335 mm

      Operation

      Fuel Capacity 22 l. and 17.5 l. 20 % more or 4.5 l.
      Hydraulic system fluid volume 25 l. and 13 l. 48 % more or 12 l.

      Motor

      Full power 13.4 kW and 9.6 kW 28 % more or 3.8 kW
      Power measured at 2500 rev / min and 2300 rev / min 8 % more or 200 rev

      Booms/sections features 1

      Maximum excavation depth 2360 mm and 2310 mm 2 % more or 50 mm

      5 reasons to buy Kubota U15:

      Operation

      Hydraulic pump flow rate 16.6 l/min and 32.9 l/min 50 % less or 16.3 l/min

      Carrier

      Maximum travel speed 4.2 km/h and 3 km/h 29 % more or 1.2 km/h
      Specific ground pressure 25.5 kPa and 26.2 kPa 3 % less or 0.7 kPa

      Booms/sections features 1

      Maximum loading height 2440 mm and 2410 mm 1 % more or 30 mm
      Maximum vertical wall digging depth 1910 mm and 1570 mm 18 % more or 340 mm

      Neutral reasons:

      Operation

      Working weight 1750 kg and 1680.1 kg

      Motor

      Manufacturer Kubota and Kubota
      Model D 1005-E diesel and D1105

      Booms/sections features 1

      Unit load-transfer height 2210 mm and 2300 mm
      Maximum radius along ground level 3840 mm and 3840 mm
      Maximum cut height 3480 mm and 3540 mm

      Images

      Sizes

      2. Width to outside of caterpillar track 1300 mm 2. Width to outside of caterpillar track 1240 mm
      5. Clearance 480 mm 5. Clearance 145 mm

      Booms/sections features 1

      9. Maximum cut height 3480 mm 9. Maximum cut height 3540 mm
      10. Maximum loading height 2410 mm 10. Maximum loading height 2440 mm
      11. Maximum radius along ground level 3840 mm 11. Maximum radius along ground level 3840 mm
      12. Maximum vertical wall digging depth 1570 mm 12. Maximum vertical wall digging depth 1910 mm
      13. Maximum excavation depth 2360 mm 13. Maximum excavation depth 2310 mm
      3. Unit load-transfer height 2210 mm 3. Unit load-transfer height 2300 mm