vs.

      Volvo EC30 vs. Case CX22B ZTS

      20 reasons to buy Volvo EC30:

      Swing device

      Rotation speed 10 rev / min and 8.7 rev / min 13 % more or 1.3 rev

      Sizes

      Counterweight ground clearance 570 mm and 480 mm 16 % more or 90 mm
      Width to outside of caterpillar track 1480 mm and 1400 mm 5 % more or 80 mm
      Clearance 280 mm and 250 mm 11 % more or 30 mm

      Operation

      Fuel Capacity 49 l. and 28 l. 43 % more or 21 l.
      Cooling system fluid volume 6 l. and 3.8 l. 37 % more or 2.2 l.
      Hydraulic system fluid volume 46.5 l. and 25 l. 46 % more or 21.5 l.
      Hydraulic system overflow valve pressure 24993.5 kPa and 23000 kPa 8 % more or 1993.5 kPa
      Hydraulic pump flow rate 62.1 l/min and 66 l/min 6 % less or 3.9 l/min

      Motor

      Effective power 17.7 kW and 17.2 kW 3 % more or 0.5 kW
      Power measured at 2400 rev / min and 2200 rev / min 8 % more or 200 rev
      Torque measured at 1600 rev / min and 1320 rev / min 17 % more or 280 rev

      Booms/sections features 2

      Maximum excavation depth 3040 mm and 2650 mm 13 % more or 390 mm
      Maximum radius along ground level 4910 mm and 4520 mm 8 % more or 390 mm
      Maximum loading height 3430 mm and 2950 mm 14 % more or 480 mm
      Maximum vertical wall digging depth 2440 mm and 2130 mm 13 % more or 310 mm

      Booms/sections features 1

      Maximum excavation depth 2740 mm and 2300 mm 16 % more or 440 mm
      Maximum radius along ground level 4620 mm and 4190 mm 9 % more or 430 mm
      Maximum loading height 3250 mm and 2720 mm 16 % more or 530 mm
      Maximum vertical wall digging depth 2150 mm and 1790 mm 17 % more or 360 mm

      4 reasons to buy Case CX22B ZTS:

      Operation

      Engine oil volume 5.5 l. and 5.2 l. 5 % more or 0.3 l.

      Motor

      Maximum torque 80.1 Nm and 77 Nm 4 % more or 3.1 Nm

      Carrier

      Maximum travel speed 4.1 km/h and 3.7 km/h 10 % more or 0.4 km/h
      Specific ground pressure 27 kPa and 31 kPa 13 % less or 4 kPa

      Neutral reasons:

      Sizes

      Rear platform swing radius 1270 mm and 740 mm
      Caterpillar track length on ground level 1910 mm and 1490 mm
      Height to cab upper part 2390 mm and 2460 mm

      Operation

      Working weight 3090.3 kg and 2550 kg

      Motor

      Cylinders number 3 and 3
      Manufacturer Mitsubishi and Yanmar
      Model S3L2 and 3TNV82A-SYB
      Displacement 1.3 l. and 1.3 l.

      Carrier

      Track width 1180 mm and 1150 mm
      Shoe dimensions 300 mm and 250 mm

      Booms/sections features 2

      Maximum cut height 4640 mm and 4190 mm
      Unit load-transfer height 2390 mm and 2460 mm
      Unit load-transfer length 4370 mm and 3820 mm

      Booms/sections features 1

      Maximum cut height 4450 mm and 3960 mm
      Unit load-transfer height 2390 mm and 2460 mm
      Unit load-transfer length 4370 mm and 3820 mm

      Images

      Sizes

      8. Rear platform swing radius 1270 mm 8. Rear platform swing radius 740 mm
      15. Counterweight ground clearance 570 mm 15. Counterweight ground clearance 480 mm
      2. Width to outside of caterpillar track 1480 mm 2. Width to outside of caterpillar track 1400 mm
      4. Caterpillar track length on ground level 1910 mm 4. Caterpillar track length on ground level 1490 mm
      5. Clearance 280 mm 5. Clearance 250 mm
      7. Height to cab upper part 2390 mm 7. Height to cab upper part 2460 mm

      Carrier

      6. Track width 1180 mm 6. Track width 1150 mm
      14. Shoe dimensions 300 mm 14. Shoe dimensions 250 mm

      Booms/sections features 1

      1. Unit load-transfer length 4370 mm 1. Unit load-transfer length 3820 mm
      3. Unit load-transfer height 2390 mm 3. Unit load-transfer height 2460 mm
      9. Maximum cut height 4640 mm 9. Maximum cut height 4190 mm
      10. Maximum loading height 3430 mm 10. Maximum loading height 2950 mm
      11. Maximum radius along ground level 4910 mm 11. Maximum radius along ground level 4520 mm
      12. Maximum vertical wall digging depth 2440 mm 12. Maximum vertical wall digging depth 2130 mm
      13. Maximum excavation depth 3040 mm 13. Maximum excavation depth 2650 mm