vs.

      Yanmar SV08-1 vs. Kubota K008-3

      4 reasons to buy Yanmar SV08-1:

      Sizes

      Clearance 230 mm and 150 mm 35 % more or 80 mm

      Operation

      Hydraulic pump flow rate 10.3 l/min and 21.2 l/min 51 % less or 10.9 l/min

      Motor

      Power measured at 2400 rev / min and 2050 rev / min 15 % more or 350 rev

      Booms/sections features 1

      Maximum loading height 2050 mm and 2032 mm 1 % more or 18 mm

      5 reasons to buy Kubota K008-3:

      Sizes

      Width to outside of caterpillar track 700 mm and 680 mm 3 % more or 20 mm

      Carrier

      Maximum travel speed 4 km/h and 1.8 km/h 55 % more or 2.2 km/h

      Booms/sections features 1

      Maximum vertical wall digging depth 1371.6 mm and 1260 mm 8 % more or 111.6 mm
      Maximum excavation depth 1714.5 mm and 1500 mm 13 % more or 214.5 mm
      Maximum radius along ground level 3022.6 mm and 2730 mm 10 % more or 292.6 mm

      Neutral reasons:

      Sizes

      Rear platform swing radius 725 mm and 762 mm

      Operation

      Working weight 1065 kg and 997.9 kg

      Motor

      Cylinders number 3 and 3
      Manufacturer Yanmar and Kubota
      Model 2TE67LBV and D722

      Carrier

      Shoe dimensions 180 mm and 180 mm

      Booms/sections features 1

      Unit load-transfer height 2200 mm and 2235.1 mm
      Unit load-transfer length 2600 mm and 2743.2 mm

      Images

      Sizes

      8. Rear platform swing radius 725 mm 8. Rear platform swing radius 762 mm
      2. Width to outside of caterpillar track 680 mm 2. Width to outside of caterpillar track 700 mm
      5. Clearance 230 mm 5. Clearance 150 mm

      Carrier

      14. Shoe dimensions 180 mm 14. Shoe dimensions 180 mm

      Booms/sections features 1

      1. Unit load-transfer length 2600 mm 1. Unit load-transfer length 2743.2 mm
      3. Unit load-transfer height 2200 mm 3. Unit load-transfer height 2235.1 mm
      10. Maximum loading height 2050 mm 10. Maximum loading height 2032 mm
      11. Maximum radius along ground level 2730 mm 11. Maximum radius along ground level 3022.6 mm
      12. Maximum vertical wall digging depth 1260 mm 12. Maximum vertical wall digging depth 1371.6 mm
      13. Maximum excavation depth 1500 mm 13. Maximum excavation depth 1714.5 mm