- Home/
- Comparison/
- Wheeled Excavator/
- Doosan S210WV vs. Hitachi ZX170W-3
Doosan S210WV vs. Hitachi ZX170W-3
17 reasons to buy Doosan S210WV:
Sizes
| Upper structure clearance | 1254 mm and 1235 mm | 2 % more or 19 mm |
Operation
| Cooling system fluid volume | 49 l. and 22 l. | 55 % more or 27 l. |
| Fuel Capacity | 350 l. and 290 l. | 17 % more or 60 l. |
Motor
| Effective power | 116.3 kW and 107 kW | 8 % more or 9.3 kW |
| Power measured at | 2200 rev / min and 2000 rev / min | 9 % more or 200 rev |
| Displacement | 5.8 l. and 5.2 l. | 10 % more or 0.6 l. |
| Torque measured at | 1600 rev / min and 1500 rev / min | 6 % more or 100 rev |
| Effective torque | 588.4 Nm and 540 Nm | 8 % more or 48.4 Nm |
| Cylinders number | 6 and 4 | 33 % more or 2 |
Boom/section options 2
| Maximum excavation depth | 6058 mm and 5330 mm | 12 % more or 728 mm |
| Maximum radius along ground level | 9363 mm and 8870 mm | 5 % more or 493 mm |
| Maximum loading height | 6604 mm and 6360 mm | 4 % more or 244 mm |
| Maximum vertical wall digging depth | 5389 mm and 4810 mm | 11 % more or 579 mm |
Boom/section options 1
| Maximum excavation depth | 6560 mm and 4960 mm | 24 % more or 1600 mm |
| Maximum radius along ground level | 9694 mm and 8500 mm | 12 % more or 1194 mm |
| Maximum loading height | 6825 mm and 6130 mm | 10 % more or 695 mm |
| Maximum vertical wall digging depth | 5868 mm and 4440 mm | 24 % more or 1428 mm |
8 reasons to buy Hitachi ZX170W-3:
Sizes
| Clearance | 350 mm and 340 mm | 3 % more or 10 mm |
Operation
| Hydraulic system fluid volume | 240 l. and 160 l. | 33 % more or 80 l. |
| Engine oil volume | 23 l. and 20.5 l. | 11 % more or 2.5 l. |
| Hydraulic pump flow rate | 400 l/min and 478 l/min | 16 % less or 78 l/min |
Boom/section options 3
| Maximum loading height | 6610 mm and 6426 mm | 3 % more or 184 mm |
| Maximum vertical wall digging depth | 5320 mm and 4860 mm | 9 % more or 460 mm |
| Maximum excavation depth | 5830 mm and 5719 mm | 2 % more or 111 mm |
| Maximum radius along ground level | 9330 mm and 8893 mm | 5 % more or 437 mm |
Neutral reasons:
Swing device
| Rotation speed | 12.2 rev / min and 12.2 rev / min |
Sizes
| Wheelbase | 2850 mm and 2550 mm |
| Overall width | 2494 mm and 2550 mm |
| Height to cab upper part | 3111 mm and 3130 mm |
Operation
| Operating voltage | 24 V and 24 V |
| Hydraulic system overflow valve pressure | 34300 kPa and 34300 kPa |
| Tyre size | 10.00-20-14PR(OTR) and 10.00-20 16PR |
| Working weight | 19799.8 kg and 16600 kg |
Motor
| Manufacturer | Doosan and Isuzu |
| Model | DB 58TIS and AI-4HK1X |
Gear box
| Transmission type | hydrostatic powershift transmission and 2-speed gearbox with gear shifting under load and axial piston hydraulic motor with variable displacement |
| Forward gears number | 2 and 2 |
| Reverse gears number | 2 and 2 |
| Maximum travel speed | 35 km/h and 35 km/h |
Boom/section options 3
| Option - Boom/Section (MEX) 3 | Boom 18'7" (5700mm)/Section 6'7" (2000mm) and Section 3080mm |
| Maximum cut height | 9226 mm and 9350 mm |
Boom/section options 2
| Maximum cut height | 9857 mm and 9100 mm |
| Option - Boom/Section (MEX) 2 | Boom 18'7" (5700mm)/Section 7'10" (2400mm) and Section 2580mm |
Boom/section options 1
| Option - Boom/Section (MEX) 1 | Boom 18'7" (5700mm)/Section 9'6" (2900mm) and Section 2200mm |
| Maximum cut height | 9867 mm and 8820 mm |
Images
Sizes
| 4. Wheelbase | 2850 mm | 4. Wheelbase | 2550 mm |
| 5. Clearance | 340 mm | 5. Clearance | 350 mm |
| 7. Height to cab upper part | 3111 mm | 7. Height to cab upper part | 3130 mm |
| 14. Upper structure clearance | 1254 mm | 14. Upper structure clearance | 1235 mm |
| 2. Overall width | 2494 mm | 2. Overall width | 2550 mm |
Boom/section options 1
| 9. Maximum cut height | 10325 mm | 9. Maximum cut height | 9350 mm |
| 10. Maximum loading height | 7368 mm | 10. Maximum loading height | 6360 mm |
| 11. Maximum radius along ground level | 8793 mm | 11. Maximum radius along ground level | 8870 mm |
| 12. Maximum vertical wall digging depth | 4860 mm | 12. Maximum vertical wall digging depth | 4810 mm |
| 13. Maximum excavation depth | 5557 mm | 13. Maximum excavation depth | 5330 mm |