- Home/
- Comparison/
- Wheeled Excavator/
- Jonyang JYL210E vs. Doosan DX190W
Jonyang JYL210E vs. Doosan DX190W
5 reasons to buy Jonyang JYL210E:
Swing device
Rotation speed | 14 rev / min and 10.9 rev / min | 22 % more or 3.1 rev |
Sizes
Upper structure clearance | 1360 mm and 1249 mm | 8 % more or 111 mm |
Operation
Hydraulic pump flow rate | 390 l/min and 400 l/min | 2 % less or 10 l/min |
Boom/section options 1
Maximum excavation depth | 6152 mm and 5565 mm | 10 % more or 587 mm |
Maximum loading height | 6980 mm and 6420 mm | 8 % more or 560 mm |
4 reasons to buy Doosan DX190W:
Sizes
Clearance | 350 mm and 300 mm | 14 % more or 50 mm |
Operation
Hydraulic system overflow valve pressure | 32400 kPa and 30000 kPa | 7 % more or 2400 kPa |
Motor
Effective power | 116.3 kW and 108 kW | 7 % more or 8.3 kW |
Gear box
Maximum travel speed | 36 km/h and 28 km/h | 22 % more or 8 km/h |
Neutral reasons:
Sizes
Overall width | 2712 mm and 2496 mm |
Height to cab upper part | 3060 mm and 3135 mm |
Wheelbase | 2960 mm and 2700 mm |
Motor
Manufacturer | BT and Doosan |
Model | Cummins 65.9-C and DL06 |
Boom/section options 1
Unit load-transfer length | 9550 mm and 8715 mm |
Option - Boom/Section (MEX) 1 | Section 2600mm and Boom 17'1" (5200mm)/Section 7'3" (2200mm) |
Unit load-transfer height | 3506 mm and 3212 mm |
Maximum cut height | 9652 mm and 9115 mm |
Images
Sizes
14. Upper structure clearance | 1360 mm | 14. Upper structure clearance | 1249 mm |
2. Overall width | 2712 mm | 2. Overall width | 2496 mm |
4. Wheelbase | 2960 mm | 4. Wheelbase | 2700 mm |
5. Clearance | 300 mm | 5. Clearance | 350 mm |
7. Height to cab upper part | 3060 mm | 7. Height to cab upper part | 3135 mm |
Boom/section options 1
1. Unit load-transfer length | 9550 mm | 1. Unit load-transfer length | 8860 mm |
3. Unit load-transfer height | 3506 mm | 3. Unit load-transfer height | 3140 mm |
9. Maximum cut height | 9652 mm | 9. Maximum cut height | 10260 mm |
10. Maximum loading height | 6980 mm | 10. Maximum loading height | 7415 mm |
13. Maximum excavation depth | 6152 mm | 13. Maximum excavation depth | 5600 mm |


