vs.

      Jonyang JYL210E vs. Jonyang JYL621H

      Neutral reasons:

      Swing device

      Rotation speed 14 rev / min and 14 rev / min

      Sizes

      Wheelbase 2960 mm and 2960 mm
      Clearance 300 mm and 300 mm
      Upper structure clearance 1360 mm and 1360 mm
      Overall width 2712 mm and 2712 mm
      Overall width with lowered supports 3300 mm and 3300 mm
      Height to cab upper part 3060 mm and 3060 mm

      Operation

      Hydraulic system overflow valve pressure 30000 kPa and 30000 kPa
      Hydraulic pump flow rate 390 l/min and 390 l/min

      Motor

      Model Cummins 65.9-C and Cummins 65.9-C
      Effective power 108 kW and 108 kW
      Manufacturer BT and BT

      Gear box

      Maximum travel speed 28 km/h and 28 km/h

      Boom/section options 1

      Option - Boom/Section (MEX) 1 Section 2600mm and Section 2600mm
      Unit load-transfer height 3506 mm and 3506 mm
      Unit load-transfer length 9550 mm and 9900 mm
      Maximum excavation depth 6152 mm and 6152 mm
      Maximum radius along ground level 9420 mm and 9420 mm
      Maximum cut height 9652 mm and 9652 mm
      Maximum loading height 6980 mm and 6980 mm

      Images

      Sizes

      2. Overall width 2712 mm 2. Overall width 2712 mm
      4. Wheelbase 2960 mm 4. Wheelbase 2960 mm
      5. Clearance 300 mm 5. Clearance 300 mm
      6. Overall width with lowered supports 3300 mm 6. Overall width with lowered supports 3300 mm
      7. Height to cab upper part 3060 mm 7. Height to cab upper part 3060 mm
      14. Upper structure clearance 1360 mm 14. Upper structure clearance 1360 mm

      Boom/section options 1

      1. Unit load-transfer length 9550 mm 1. Unit load-transfer length 9900 mm
      3. Unit load-transfer height 3506 mm 3. Unit load-transfer height 3506 mm
      9. Maximum cut height 9652 mm 9. Maximum cut height 9652 mm
      10. Maximum loading height 6980 mm 10. Maximum loading height 6980 mm
      11. Maximum radius along ground level 9420 mm 11. Maximum radius along ground level 9420 mm
      13. Maximum excavation depth 6152 mm 13. Maximum excavation depth 6152 mm