vs.

      Komatsu PW95-1 vs. Caterpillar M312

      2 reasons to buy Komatsu PW95-1:

      Operation

      Hydraulic system overflow valve pressure 34335.9 kPa and 32991.4 kPa 4 % more or 1344.5 kPa
      Hydraulic pump flow rate 238 l/min and 270 l/min 12 % less or 32 l/min

      9 reasons to buy Caterpillar M312:

      Sizes

      Clearance 375 mm and 330 mm 12 % more or 45 mm
      Upper structure clearance 1262 mm and 1100 mm 13 % more or 162 mm

      Operation

      Fuel Capacity 230 l. and 140 l. 39 % more or 90 l.
      Hydraulic system fluid volume 180 l. and 82 l. 54 % more or 98 l.

      Motor

      Full power 85 kW and 56 kW 34 % more or 29 kW

      Gear box

      Maximum travel speed 33.8 km/h and 32 km/h 5 % more or 1.8 km/h

      Boom/section options 1

      Maximum excavation depth 4420 mm and 3410 mm 23 % more or 1010 mm
      Maximum radius along ground level 7620 mm and 6325 mm 17 % more or 1295 mm
      Maximum loading height 5640 mm and 4440 mm 21 % more or 1200 mm

      Neutral reasons:

      Sizes

      Overall width 2312 mm and 2500 mm
      Height to cab upper part 2980 mm and 3070 mm
      Wheelbase 2200 mm and 2500 mm

      Motor

      Displacement 4 l. and 4 l.
      Model 1004.4 and 3054TA

      Boom/section options 1

      Maximum cut height 6410 mm and 7880 mm
      Option - Boom/Section (MEX) 1 Boom 9'8" (2950mm)/Section 5'3" (1600mm) and Boom / Section 1600mm

      Images

      Sizes

      2. Overall width 2312 mm 2. Overall width 2500 mm
      4. Wheelbase 2200 mm 4. Wheelbase 2500 mm
      5. Clearance 330 mm 5. Clearance 375 mm
      7. Height to cab upper part 2980 mm 7. Height to cab upper part 3070 mm
      14. Upper structure clearance 1100 mm 14. Upper structure clearance 1262 mm

      Boom/section options 1

      9. Maximum cut height 6410 mm 9. Maximum cut height 8550 mm
      10. Maximum loading height 4440 mm 10. Maximum loading height 6190 mm
      11. Maximum radius along ground level 6325 mm 11. Maximum radius along ground level 8590 mm
      13. Maximum excavation depth 3410 mm 13. Maximum excavation depth 5420 mm